| 1976 |
|
--------------- |
|
Cal-Am’s Proposed Canada De La Segunda Pipeline & Begonia Iron Removal Plant Project EIR |
Draft |
Canada De La Segunda |
|
|
Y |
| 1977 |
|
Boudreau, Hal |
|
Lessons Learned from Mandatory Water Rationing on the Monterey Peninsula 1977 |
|
Monterey Peninsula |
Water Quantity |
|
Y |
| 1978 |
|
|
CH2MHILL |
Carmel Valley Vegetation Study |
|
Carmel Valley |
Riparian |
|
Y |
| 1978 |
August |
Clayton, Carlton J. |
|
Review of Studies & Reports for Supplemental Water Supply for Zone 11 (MCFC&WCD) |
|
Zone 11 |
Water Quantity |
|
Y |
| 1979 |
March |
Buel, Bruce |
MPWMD |
Final Report to the California Coastal Commission |
Final |
|
|
|
Y |
|
|
|
USGS |
Los Padres Sedimentation Study |
|
Los Padres Dam |
Sedimentation |
|
|
| 1979 |
November |
Cortright, Clifford J. |
|
Technical Feasibility Study (Carmel River Dam Sites) |
|
Carmel River Dam |
|
|
Y |
| 1979 |
November |
Lewis, Robert C. |
|
Proposed Dams on the Carmel River in Monterey County (Steelhead Release Reconnaissance) |
|
|
Wildlife Habitat |
Steelhead |
Y |
| 1980 |
|
*** |
|
Possible Off-Stream Storage Sites Map |
|
|
|
|
Y |
| 1980 |
January |
|
MPWMD/CAL-AM |
Position Paper Re: Cal-Am Subcommittee Rate Application |
Draft |
|
|
|
Y |
| 1980 |
February |
Logan, John |
|
Reconnaissance Study of Off-Channel Reservoirs Carmel River Basin |
|
Carmel River |
|
|
Y |
| 1980 |
April |
Williams, John G. |
MPWMD |
Stream Flow & Reservoir Yield at the San Clemente Site Carmel River |
|
San Clemente Dam |
Water Quantity |
|
Y |
| 1980 |
July |
Cortright, Clifford J. |
|
New San Clemente Dam & Reservoir Cost Estimates |
|
San Clemente Dam |
|
|
Y |
| 1980 |
July |
Fritts, Harold C. and Gordon, Geoffrey A. |
|
Annual Precipitation for California Since 1600, Reconstructed From Western North American Tree Rings |
|
|
Water Quantity |
|
Y |
| 1980 |
August |
Cortright, Clifford J. |
|
Chupines Creek Dam & Reservoir Reconnaissance Level Cost Estimate |
|
Chupines Creek Dam |
|
|
Y |
| 1980 |
October |
Woodhouse, Robert |
|
Physiological Ecology Reconnaissance Study |
|
|
Wildlife Habitat |
|
Y |
| 1980 |
October |
|
Recht Hausrath & Associates |
Economic & Demand Projections |
|
|
|
|
Y |
| 1980 |
October |
|
Recht Hausrath & Associates |
Financing Mechanisms & Revenue Sources |
|
|
|
|
Y |
| 1980 |
October |
Walsh, Kevin |
MPWMD |
Review of Seaside Ponding Project |
|
Seaside |
|
|
Y |
| 1980 |
October |
Lewis, Robert C. |
|
Flow Requirements in the Carmel River With the Proposed New San Clemente Dam |
|
San Clemente Dam |
Water Quantity |
|
Y |
| 1980 |
November |
|
U.C. Berkeley |
Residential and Institutional Rainwater Collection Systems |
|
|
Water Quantity |
|
Y |
| 1981 |
February |
|
SERL |
Rainwater Collection System |
|
|
Water Quantity |
|
Y |
| 1981 |
May |
Buel, Bruce |
MPWMD |
Standby Rationing Plan |
|
|
Water Quantity |
|
Y |
| 1981 |
May |
|
US Army Corps of Engineers |
Feasibility Report on Water Resources Development Carmel River |
|
Carmel River |
Groundwater |
|
Y (located on General Manager's bookshelf) |
| 1981 |
July |
Ward, Davis, and Dixon |
Converse Consultants |
Economic Feasibility Analysis & Comprehensive Water Supply Program |
|
|
Water Quantity |
|
Y |
| 1981 |
July |
Logan, John |
|
Reconnaissance of Alternatives for Recharging Seaside Aquifer |
|
Seaside |
Water Quantity |
|
Y |
| 1981 |
July |
Curry, Robert and Kondolf, G. Mathias |
|
Carmel River Sediment Study |
|
Cramel River |
Sediment Transport |
|
Y |
| 1981 |
August |
Schmidt, Kenneth D. |
|
Ryan Ranch Water Supply |
|
Ryan Ranch |
Water Quantity |
|
Y |
| 1981 |
September |
|
D.W. Kelley & Associates |
Reconnaissance of Water Development for the Carmel River |
|
Carmel River |
|
|
Y |
| 1981 |
September |
Curry, Robert R. and Kondolf, G. Mathias |
|
The Role Riparian Vegetation in Channel Bank Stability: Carmel River CA |
|
Carmel River |
Riparian |
|
Y |
| 1981 |
September |
Hecht, Berry |
|
Sequential Changes in Bed Habitat Conditions in the Upper Carmel River Following the Marble-Cone Fire of August 1977 |
|
Upper Carmel River |
Wildlife Habitat |
|
Y |
| 1981 |
October |
Beattie, Joan and Murphy, Patti |
USC |
Vegetation of the Carmel River Valley |
|
Carmel River |
Riparian |
|
Y |
| 1981 |
November |
Buel, Bruce |
MPWMD |
Investigation into Los Padres Reservoir Silt Release |
Final |
Los Padres Dam |
|
|
Y |
| 1981 |
November |
Hydro Data Inc. |
Hydro Data Inc. |
Evaluation of Bank Erosion Near Manor Well |
|
Manor Well |
Erosion |
|
Y |
| 1981 |
November |
Dettman, D.H. |
D.H. Dettman D.W. Kelley & Associates |
Reconnaissance Report: Streambed Sedimentation and Steelhead Habit in the Carmel River Below Los Padres With Some Possible Solutions to the Problem |
|
Los Padres Dam |
Wildlife Habitat |
Steelhead |
Y |
| 1981 |
November |
Logan, John |
|
Fort Ord (Seaside) Monitor Wells |
|
Fort Ord |
Groundwater |
|
Y |
| 1981 |
December |
Curry, Robert W. |
|
Sediment Transport Analysis Between Los Padres and San Clemente Reservoirs |
|
Los Padres Dam |
Sediment Transport |
|
Y |
| 1982 |
January |
Logan, John |
WWD Corporation |
Seaside Recharge Predesign Study Coastal Barrier Experiment |
|
Seaside |
Groundwater |
|
Y |
| 1982 |
February |
|
James M. Montgomery Consulting Engineers |
Carmel Valley Wastewater Study |
|
Carmel Valley |
Wastewater |
|
Y |
| 1982 |
March |
Logan, John |
|
The Estimated "Excess" Capacity of Canada Pipeline |
|
|
|
|
Y |
| 1982 |
March |
Buel, Bruce |
MPWMDv |
Carmel River Management Program |
|
Carmel River |
Management |
|
Y |
| 1982 |
March |
Logan, John |
WWD Corporation |
Seaside Recharge Predesign Study Injection Trials at Plumas 2 |
|
Seaside |
Groundwater |
|
Y |
| 1982 |
March |
|
D.W. Kelley & Associates |
The Probable Effect of Carmel River Water Supply Alternatives on Steelhead Resources |
|
Carmel River |
Water Quantity |
Steelhead |
Y |
| 1982 |
May |
|
MPWMD |
Model Ordinance |
|
|
|
|
Y |
| 1982 |
June |
Logan, John |
|
Hydrogeology of the Seaside Area |
|
Seaside |
|
|
Y |
| 1982 |
June |
Logan, John |
|
Recharge of the Carmel Valley Aquifer: A Preliminary Assessment |
|
Carmel Valley |
Groundwater |
|
Y |
| 1982 |
June |
|
MPWMD |
MPWMD Water Supply Project - Initial Study and Scope of Work |
|
|
Water Quantity |
|
Y |
| 1982 |
June |
Logan, John |
|
Percolation at Ryan Ranch |
|
Ryan Ranch |
|
|
Y |
| 1982 |
July |
|
USGS |
Letter Report on Old Carmel Rating Curve |
|
|
|
|
Y |
| 1982 |
July |
Krebs, Frances |
Krebs and McClain |
Operations Model Documentation for On-Channel and Off-Channel Reservoirs |
|
|
|
|
Y |
| 1982 |
August |
|
Recht Hausrath & Associates |
Economic & Demographic Forecasts |
Draft Report |
|
|
|
Y |
| 1982 |
August |
|
Converse Consultants |
New San Clemente Project Preliminary Design & Feasibility Study |
|
San Clemente Dam |
|
|
Y |
| 1982 |
September |
|
WWD Corporation |
Pressurized Recharge at the Plumas Site Seaside |
|
Seaside |
Groundwater |
|
Y |
| 1982 |
September |
Muir, K.S. |
USGS |
Groundwater in the Seaside Area Monterey Co. CA (USGS Water Resources Investigations 82-10) |
|
Seaside |
Groundwater |
|
Y |
| 1982 |
October |
|
Converse Consultants |
New San Clemente Project Conceptual Design & Cost Estimate of Fish Attraction Facilities |
|
San Clemente Dam |
|
|
Y |
| 1982 |
November |
Kondolf, G. Mathias and Curry, Robert |
|
Seepage Investigations Carmel River 1982 Water Year |
|
Carmel River |
|
|
Y |
| 1982 |
November |
Buel, Bruce |
MPWMD |
Comparison of Water Supply Alternatives |
|
|
Water Quantity |
|
Y |
| 1982 |
December |
|
Converse Consultants |
New San Clemente Project Conceptual Design and Cost Allowance of Diversion Alternatives |
|
San Clemente Dam |
|
|
Y |
| 1982 |
December |
Cortright, Clifford J. |
|
Arroyo Seco Dam Sites |
|
Arroyo Seco Dam |
|
|
Y |
| 1982 |
December |
Buel, Bruce |
MPWMD |
Applications Relating to the MPWMD Water Supply and Management Project |
|
|
Water Quantity |
|
Y |
| 1982 |
December |
|
Recht Hausrath & Associates |
Economic and Demographic Projections |
Draft |
|
|
|
Y |
| 1982 |
|
Kondolf, G. Mathias |
|
Recent Channel Instability and Historic Channel Changes of the Carmel River, Monterey Co. CA. (MS Thesis U.C. Santa Cruz) |
|
Carmel River |
|
|
Y |
| 1983 |
January |
G.W. Kapple, G.W., Johnson, M.J., and Van Schoten, D.A. |
USGS |
Digital Flow Model of the Carmel Valley Alluvial Ground Water Basin (draft) |
|
Carmel Valley |
Groundwater |
|
Y |
| 1983 |
January |
Woodhouse, Robert |
|
Baseline Analysis of the Riparian Vegetation in the Lower Carmel Valley |
|
Lower Carmel Valley |
Carmel Valley |
Riparian |
Y |
| 1983 |
January |
Williams, John G. |
MPWMD |
Carmel River Watershed Management Plan Working Paper No. 1: Habitat Change in the Carmel River Basin |
|
Carmel River |
Wildlife Habitat |
|
Y |
| 1983 |
January |
|
Recht Hausrath & Associates |
Economic & Demographic Projections |
|
|
|
|
Y |
| 1983 |
February |
|
USGS |
Sediment Data Collected in Carmel Valley |
|
Carmel Valley |
Sediment Transport |
|
Y |
| 1983 |
March |
Buel, Bruce, and Anderson, R. K. |
MPWMD |
Engineer's Report, Carmel River Management Zone (MPWMD Zone #3) |
|
Carmel Valley |
|
|
Y |
| 1983 |
March |
|
Federal Emergency Management Agency |
Flood Insurance Study |
Preliminary |
|
Flooding |
|
Y |
| Undated |
|
|
San Diego Water Utilities Department |
Municipal Sewage Treated to Potability Using Aquaculture Through Membranes |
|
|
Sewage |
Aquaculture |
Y |
| 1983 |
April |
Williams, John G. |
MPWMD |
Carmel River Watershed Management Plan Working Paper No. 2: Water Supply Options for the Monterey Peninsula |
|
Monterey Peninsula |
Water Quantity |
Management |
Y |
| 1983 |
April |
|
LAFCO |
MPWMD Sphere of Influence |
|
|
|
|
Y |
| 1983 |
April |
Logan, John |
|
The Carmel Valley Alluvial Aquifer: Bedrock Geometry Hydraulic Parameters and Storage Capacity |
Final |
Carmel Valley |
Groundwater |
|
Y |
| 1983 |
May |
|
Recht Hausrath & Associates |
Economic & Demographic Forecasts |
Draft Report |
|
|
|
Y |
| 1983 |
June |
|
D.W. Kelley & Associates |
Assessment of Carmel Steelhead Resource: Its Relationship to Streamflow and to Water Supply Alternatives |
Draft |
|
Water Quantity |
Steelhead |
Y |
| 1983 |
June |
|
MPWMD |
Scope of Work, Water Supply Project Environmental Impact Report |
Revised Draft |
|
Water Quantity |
|
Y |
| 1983 |
June |
Williams, John and Kondolf, G. Mathias |
|
Channel Stability & Fish Habitat Carmel River CA Symposium & Field Conference Guidebook |
|
Carmel River |
Channel Stability |
Wildlife Habitat |
Y |
| 1983 |
June |
Krebs, Frances |
|
Computation of Total Sediment Load of the Carmel River, CA |
|
Carmel River |
Sediment Transport |
|
Y |
| 1983 |
June |
Snider, William |
Calif. Dept. of Fish and Game |
Reconnaissance of the Steelhead Resource of the Carmel River Drainage |
|
Carmel River |
Steelhead |
|
Y |
| 1983 |
June |
|
Converse Consultants |
New San Clemente Project Conceptual Design & Cost Estimate of a Rollcrete Dam Alternate |
Draft |
San Clemente Dam |
|
|
Y |
| 1983 |
July |
Logan, John |
|
Storage Calculations Carmel Valley Alluvial Aquifer |
|
Carmel Valley |
Groundwater |
|
Y |
| 1983 |
August |
Williams, John G. |
MPWMD |
Habitat Protection in the Carmel River Basin: Legal Issues CRWMP Working Paper No. 3 |
|
Carmel River |
Wildlife Habitat |
|
Y |
| 1983 |
August |
Williams, Molly |
|
Avifauna of the Carmel River Riparian Corridor, CRWMP, Working Paper No. 4 |
|
Carmel River |
Riparian |
|
Y |
| 1983 |
August |
|
MPWMD |
Carmel River Management Zone Assessment List |
|
Carmel River |
|
|
Y |
| 1983 |
September |
Buel, Bruce |
MPWMD |
Letter to Riverfront Property Owners re Permit Process |
|
|
|
|
Y |
| 1983 |
September |
Williams, John G. |
MPWMD |
Legal Status of Carmel Valley Groundwater, CRWMP, Working Paper No. 6 |
|
Carmel Valley |
Groundwater |
|
Y |
| 1983 |
October |
Williams, Molly |
|
Riparian Mammals and Herptofauna of Carmel Valley, CRWMP, Working Paper No. 4 1/2 |
|
Carmel Valley |
Riparian |
Wildlife Habitat |
Y |
| undated |
|
Mount, Russ |
|
Pumping Tests of Four Wells in Lower Carmel Valley, CA for California-American Water Company (Draft) |
|
Lower Carmel Valley |
Groundwater |
|
Y |
| 1983 |
October |
|
Graham Matthews & Asso. |
Discharge & Sediment Load for Tributaries to the Carmel River, CRWMP, Working Paper No. 5 |
|
Carmel River Tributaries |
Sediment Transport |
|
Y |
| 1983 |
October |
|
Graham Matthews & Asso. |
A Summary of the Report Entitled: Discharge & Sediment Load for Tributaries to the Carmel River, CRWMP, Working Paper No. 5 |
|
Carmel River |
Sediment Transport |
|
Y |
| Various |
|
Adjarian, Fred |
|
Misc. Documents Relating to EIR |
|
|
|
|
Y |
| 1983 |
October |
|
Converse Consultants |
New San Clemente Project Evaluation of Hydroelectric Power |
|
San Clemente Dam |
|
|
Y |
| Various |
|
Adjarian, Fred |
|
EIR Segments |
|
|
|
|
Y |
| 1983 |
October |
Wagner, Charles H. |
|
Study of Upstream and Downstream Migrant Steelhead Passage Facilities for the Los Padres Project and New San Clemente Project |
|
Los Padres Dam |
Steelhead |
|
Y |
| 1983 |
December |
Curry, R. |
|
Sediment Transport and Channel Stability Carmel |
Draft |
|
Sediment Transport |
Channel Stability |
Y |
| 1983 |
December |
|
Herman Kimmel & Associates |
Traffic Engineering Analysis San Clemente Dam Project |
|
San Clemente Dam |
|
|
Y |
| 1983 |
December |
|
CAL-AM Water Company |
Carmel Valley Well Scheduling Program |
|
Carmel River |
Groundwater |
|
Y |
| 1983 |
December |
|
WESTEC Services Inc. |
Cultural Resources Survey San Clemente Dam Enlargement Upper Carmel Valley |
|
San Clemente Dam |
|
|
Y |
| 1983 |
December |
Logan, John |
|
A Review of 1982 Pumping Tests of the Pearce Cypress San Carlos and Rancho San Carlos Wells Carmel Valley |
|
Carmal Valley |
Groundwater |
|
Y |
| 1984 |
January |
|
WESTEC Services Inc. |
Noise Assessment San Clemente Dam Enlargement Upper Carmel Valley |
|
San Clemente Dam |
|
|
Y |
| 1984 |
January |
Heuer, Dick |
MPWMD |
Re-Examination of Supply and Demand in the Monterey Peninsula Water Management District |
Draft |
Monterey Peninsula |
Water Quantity |
|
Y |
| 1984 |
March |
Williams, John G. |
MPWMD |
Carmel River Watershed Management Plan |
Draft |
Carmel River |
Management |
|
Y |
| 1984 |
March |
Curry, Robert |
|
Observations on Quaternary and Recent Fault Activity, Central Coastal California |
|
|
|
|
Y |
| 1984 |
April |
Benoit, John |
MPWMD |
Water Conservation Plan for Monterey County |
Final Draft |
Monterey County |
Water Quantity |
|
Y |
| 1984 |
April |
Page, Gary L. and Matthews, Graham |
MPWMD |
Carmel River Management Plan |
Final |
Carmel River |
Management |
|
Y |
| 1984 |
April |
|
MPWMD |
Water Conservation Plan, Executive Summary |
|
|
Water Quantity |
|
Y |
| 1984 |
April |
|
DMA Consulting Engineers |
Phase I Report Irrigation System Design Lower Carmel |
|
Lower Carmel Valley |
|
|
Y |
| 1984 |
April |
|
MPWMD |
1984 Drought Report |
|
|
Water Quantity |
|
Y |
| 1984 |
May |
|
Converse Consultants |
New San Clemente Project Fish Passage Facilities |
|
San Clemente Dam |
Wildlife Habitat |
|
Y |
| 1984 |
May |
Page, Gary L. |
MPWMD |
Engineer's Report, Boronda Erosion Control Project (MPWMD Zone No. 4) |
|
|
Erosion |
|
Y |
| 1984 |
May |
|
DMA Consulting Engineers |
Preliminary Design & Cost Estimate Boronda Project Irrigation System Carmel River Management Program |
|
Carmel River |
Water Quantity |
Management |
Y |
| 1984 |
May |
|
Converse Consultants |
New San Clemente Project Geotechnical Studies for the EIR |
|
San Clemente Dam |
|
|
Y |
| 1984 |
May |
|
Wulff Hansen & Co. |
Boronda Erosion Control Project Zone (Zone No. 4), Underwriting |
|
|
Erosion |
|
Y |
| 1984 |
June |
King, Richard W. |
|
Assessing the Use of Direct Recycle of Wastewater for Potable Water Supply in the Monterey Peninsula |
|
Monterey Peninsula |
Water Quantity |
Wastewater |
Y |
| 1984 |
June |
Maloney, Linda |
|
Aquifer-Stream Interaction in the Lower Carmel Valley, July 1983-January 1984 |
|
Lower Carmel Valley |
|
|
Y |
| 1984 |
June |
|
Recht Hausrath & Associates |
Growth Impacts: Housing & Employment Forecasts With and Without the Proposed Project |
Draft |
|
|
|
Y |
| 1984 |
June |
|
Recht Hausrath & Associates |
Socioeconomic Impacts of the Proposed San Clemente Dam Working Paper No. 1. Growth Impacts: Housing & Employment Forecasts With and Without the Proposed Project |
|
San Clemente Dam |
|
|
Y |
| 1984 |
June |
|
MPWMD |
MPWMD Responsibilities and Expenditure History |
|
|
|
|
Y |
| 1984 |
June |
Kapple et al. |
USGS |
Analysis of the Carmel Valley Alluvial Ground Water Basin Monterey Co. CA (USGS Water-Resources Investigations Report 83-4280) |
|
|
Groundwater |
|
Y |
| 1984 |
July |
|
Rauscher Pierce Refnes Inc |
Work Product No. 1 Pertaining to Financial Analysis of the San Clemente Dam Project |
|
San Clemente Dam |
|
|
Y |
| 1984 |
July |
|
Converse Consultants |
New San Clemente Project Preappraisal Engineering Studies |
|
San Clemente Dam |
|
|
Y |
| 1984 |
July |
|
MPWMD |
Contract Documents for the Drilling of Three Observation Wells and Fourteen Neutron Probe Access Tubes in Carmel Valley |
|
Carmel Valley |
Groundwater |
|
Y |
| 1984 |
July |
Page, Gary L. |
MPWMD |
Analysis of Specific Works, Carmel Valley Trail & Saddle Club |
|
|
|
|
Y |
| 1984 |
July |
|
Prepared for the City of San Diego by the Health Advisory Committee |
Proposed Workplan for the Evaluation of Potential Health Risk Associated with the San Diego Total Recovery Program |
|
San Deigo |
|
|
Y |
| 1984 |
July |
Logan, John |
|
Increased Ground Water Production in the Seaside Area |
Draft |
Seaside |
Groundwater |
|
Y |
| 1984 |
July |
|
Rogers E. Johnson & Assoc |
New San Clemente Dam Geotechnical Investigation: Location |
|
San Clemente Dam |
|
|
Y |
| 1984 |
August |
|
ESA |
Carmel River Management Plan & Boronda Erosion Project EIR |
|
Carmel River |
Erosion |
Management |
Y |
| 1984 |
August |
|
D.W. Kelley & Associates |
Evaluation of Alternative Upstream Fish Passage Facilities Over San Clemente |
|
San Clemente Dam |
Wildlife Habitat |
|
Y |
| 1984 |
August |
|
D.W. Kelley & Associates |
Appendices to: Assessment of the Carmel River Steelhead Resource; Its Relationship to Streamflow; and to Water Supply Alternatives |
|
Carmel River |
Water Quantity |
Steelhead |
Y |
| 1984 |
August |
Buel, Bruce |
MPWMD |
Network Analysis San Clemente Dam |
|
San Clemente Dam |
|
|
Y |
| 1984 |
August |
|
Engineering Science Inc. |
Pebble Beach Community Services District Wastewater Treatment and Disposal Project |
Draft EIR |
Pebble Beach |
Wastewater |
|
Y |
| 1984 |
September |
Woodhouse, R.M. |
|
Water Potential and Vegetation Survey of the Lower Carmel River |
|
Lower Carmel River |
Water Quantity |
Riparian |
Y |
| 1984 |
October |
|
MPWMD |
Willow Planting Guidelines |
|
|
|
|
Y |
| 1984 |
October |
|
MPWMD |
Response to Comments on Carmel River Management Plan and Boronda Erosion Control Project Draft EIR |
|
Carmel River |
Erosion |
Management |
Y |
| 1984 |
November |
|
MPWMD-Financial Advisory Committee |
Recommendation for the Financing of San Clemente |
Final |
San Clemente Dam |
|
|
Y |
| 1984 |
November |
Matthews, Graham |
MPWMD |
Carmel River Research Program, 1984 |
Draft |
Carmel River |
|
|
Y |
| 1984 |
December |
Stern, Henrietta |
MPWMD |
Initial Study, Ord Village Reclamation Pilot Plant |
|
Fort Ord |
|
|
Y |
| 1984 |
December |
Byrnes, John |
MPWMD |
Field Report Discharges of the Carmel River and Carmel Valley Water Table Levels |
|
Carmel River |
Groundwater |
|
Y |
| 1984 |
December |
|
Creegan & D'Angelo |
Aquaculture Reclamation Program Ord Village Pilot Plant |
|
Fort Ord |
Aquaculture |
|
Y |
| 1984 |
December |
McGlochlin, Linda |
|
Aquifer-Stream Interaction in the Lower Carmel Valley |
|
Lower Carmel Valley |
|
|
Y |
| 1985 |
January |
|
MCFC & WCD |
Flood Fighting and Erosion Control Manual |
|
|
Erosion |
Flooding |
Y |
| 1985 |
January |
|
DMA Consulting Engineers |
Phase 3 Report, Irrigation System Riparian Corridor, Lower Carmel Valley |
|
Lower Carmel Valley |
Riparian |
|
Y |
| 1985 |
January |
|
Converse Consultants |
New San Clemente Project; Joint Use Facilities Progress Report |
|
San Clemente Dam |
|
|
Y |
| 1985 |
January |
|
Rogers E. Johnson & Assoc |
New San Clemente Dam, Geotechnical Investigation of Faulting in the Knothole Area |
|
San Clemente Dam |
|
|
Y |
| 1985 |
February |
Krebs, Frances |
|
An Analysis of the Sediment Discharged into the Carmel Bay from the Carmel River and the Carmel Sanitary District Outfall |
|
Carmel Bay |
Sediment Transport |
|
Y |
| 1985 |
March |
Buel, Bruce |
MPWMD |
Summary, San Clemente Dam Project |
|
San Clemente Dam |
|
|
Y |
| 1985 |
March |
|
MPWMD |
Guidelines for Performance Appraisal |
|
|
|
|
Y |
| 1985 |
March |
|
Recht Hausrath & Associates |
Hotel Employee Projections as a Component of June 1984 Job Projections |
|
|
|
|
Y |
| 1985 |
April |
Ricker, Michael |
MPWMD |
How are New Water Connection Fees Computed? |
|
|
|
|
Y |
| 1985 |
April |
|
Recht Hausrath & Associates |
Working Paper No. 3, Socioeconomic Impacts of Proposed San Clemente Dam |
Draft |
San Clemente Dam |
|
|
Y |
| 1985 |
April |
|
Recht Hausrath & Associates |
Hotel Employee Projection & as Component of June 1984 Job Projections Under All Three Scenarios |
|
|
|
|
Y |
| 1985 |
April |
|
Graham Matthews & Asso. |
Portable Irrigation System Testing Report |
|
|
|
|
Y |
| 1985 |
April |
|
Rogers E. Johnson & Assoc |
Investigation of Possible Fault Offsets in Stream Terraces Along the Carmel River at Sleepy Hollow |
|
Sleepy Hollow |
|
|
Y |
| 1985 |
April |
Matthews, Graham |
MPWMD |
Summary of Boronda Erosion Control Project |
|
|
Erosion |
|
Y |
| 1985 |
May |
|
Geomatrix |
Evaluation of Seismic Design Criteria New San Clemente Dam |
|
San Clemente Dam |
|
|
Y |
| 1985 |
May |
Buel, Bruce |
MPWMD |
CAL-AM Allocation Summary |
|
|
|
|
Y |
| 1985 |
May |
Buel, Bruce |
MPWMD |
1985-86 Water Supply Strategy |
|
|
Water Quantity |
|
Y |
| 1985 |
May |
Stern, Henrietta |
MPWMD |
EIR Ord Village Reclamation Plant |
Draft |
Fort Ord |
|
|
Y |
| 1985 |
May |
|
Converse Consultants |
Ground Water Evaluation of the Seaside Aquifer |
Phase I Final Report |
Seaside |
Groundwater |
|
Y |
| 1985 |
May |
|
Converse Consultants |
Ground Water Evaluation of Seaside Aquifer System |
Addendum to Phase I Final Report |
Seaside |
Groundwater |
|
Y |
| 1985 |
May |
|
Converse Consultants |
New San Clemente Project; Consultants Joint Use Studies |
Draft |
San Clemente Dam |
|
|
Y |
| 1985 |
June |
|
MPWMD |
Carmel River Management Program Newsletter – Summer 1985 |
|
Carmel River |
|
|
Y |
| 1985 |
June |
Stern, Henrietta |
MPWMD |
Project Summary, Ord Village Pilot Reclamation Plant |
|
Fort Ord |
|
|
Y |
| 1985 |
June |
Anderson, Nichols |
|
Hydrology Study for Point Lobos Ranch (with Addendum of June 1985) |
Final |
Point Lobos Ranch |
|
|
Y |
| 1985 |
June |
|
California Public Utilities Commission |
General Report on the Results of Cal-Am Water Company for Test Years 1986 and 1987 in Connection With: (four Division application numbers) |
|
|
|
|
Y |
| 1985 |
June |
|
California Public Utilities Commission |
Report on the Operations of Cal-Am Water Co. in the Monterey Peninsula District for Test Years 1986 and 1987 |
|
Monterey Peninsula |
|
|
Y |
| 1985 |
July |
Litwin, Yoram and Davis, John |
|
Review of the MPWMD Daily Simulation Model |
|
|
|
|
Y |
| 1985 |
July |
Matthews, Graham |
MPWMD |
MPWMD Irrigation Program: Review of Its Development |
|
|
|
|
Y |
| 1985 |
July |
Laredo, David |
|
Irrigation License and River Corridor Access Permission |
|
|
|
|
Y |
| 1985 |
July |
|
California Public Utilities Commission |
Report on the Cost of Capital and Rate of Return for Cal-Am Water Company Division Rate of Return Section |
|
|
|
|
Y |
| 1985 |
July |
Dreiss, Shirley J. and Reid, Mark |
U.C. Santa Cruz |
Data Analysis and Numerical Model Development for the Carmel Valley Aquifer |
|
Carmel Valley |
Groundwater |
|
Y |
| 1985 |
July |
Anderson, Nichols |
|
Monterra Ranch Water Supply Study |
|
Monterra Ranch |
Water Quantity |
|
Y |
| 1985 |
July |
|
DMA Consulting Engineers |
Phase 3 Report Irrigation System, Riparian Corridor, Lower Carmel Valley |
|
Lower Carmel Valley |
Riparian |
|
Y |
| 1985 |
July |
Woodhouse, Robert M. |
|
Analysis of the Phase 3 Report on 1984 Lower Carmel Production Well Pumping Data |
|
Lower Carmel Valley |
Groundwater |
|
Y |
| 1985 |
July |
Stern, Henrietta |
MPWMD |
Final EIR Ord Village |
Working Draft |
Fort Ord |
|
|
Y |
| 1985 |
July |
Recht, Richard |
Recht Hausrath & Associates |
The Effect of Revised Connection Fees & Water User Charges on Development |
|
|
|
|
Y |
| 1985 |
August |
Oliver, Joseph |
MPWMD |
Independent Review of Pumping Test Documentation in DMA Phase 3 Report |
|
|
|
|
Y |
| 1985 |
August |
Clark, Joseph C. and McKittrick, Mary A. |
|
Reconnaissance Field Study of the Relationship Between Tularcitos & Navy Fault Zones |
|
Tularcitos & Navy Fault Zones |
|
|
Y |
| 1985 |
August |
Woodhouse, R.M. |
|
Analysis of the Phase 3 Report on 1984 Lower Carmel Production Well Pumping Data |
|
Lower Carmel Valley |
Groundwater |
|
Y |
| 1985 |
August |
|
Converse Consultants |
New San Clemente Project; Joint Use Studies |
Final |
San Clemente Dam |
|
|
Y |
| 1985 |
September |
|
Creegan & D'Angelo |
Feasibility Analysis of Wastewater Reclamation for Groundwater Recharge |
|
|
Groundwater |
|
Y |
| 1985 |
September |
Anderson, Nichols |
|
Water Supply Study for Laguna Seca Ranch |
|
Laguna Seca |
Water Quantity |
|
Y |
| 1985 |
September |
Stern, Henrietta |
MPWMD |
Final EIR, Ord Village Pilot Reclamation Plant (plus David Shonman's Butterfly Report) |
Final |
Fort Ord |
Wildlife Habitat |
|
Y |
| 1985 |
October |
|
MPWMD |
Water Conservation Plan for Monterey County |
Draft |
Monterey County |
Water Quantity |
|
Y |
| 1985 |
October |
|
MPWMD |
1985-86 District Goals & Objectives |
|
|
|
|
Y |
| 1985 |
October |
Oliver, Joseph |
MPWMD |
MPWMD Research Program for 1985-86 |
|
|
|
|
Y |
| 1985 |
October |
Litwin, Yoram |
|
Phase II Review of the MPWMD Daily Simulation Model of |
|
|
|
|
Y |
| 1985 |
November |
|
MPWMD |
Summary of MPWMD Allocations Adopted April 1981 |
|
|
|
|
Y |
| 1985 |
November |
|
MPWMD |
Fisheries Restoration Act of 1985, Proposal Number One |
|
|
Wildlife Habitat |
|
Y |
| 1985 |
November |
|
Luhdorff & Scalmanini |
Feasibility Study of Developing a Water Supply tularcitos Formation Carmel Valley Ranch |
Draft |
Carmel Valley Ranch |
Water Quantity |
|
Y |
| 1985 |
November |
|
Luhdorff & Scalmanini |
Feasibility Study of Developing a Water Supply Tularcitos Formation Carmel Valley Ranch |
Final |
Carmel Valley Ranch |
Water Quantity |
|
Y |
| 1985 |
December |
|
Aqua Terra |
Laguna Seca Ranch Water Supply |
Proposal |
Laguna Seca |
Water Quantity |
|
Y (Missing from file when Archived) |
| 1985 |
December |
|
DMA Consulting Engineers |
Drawdown Simulation Lower Carmel Valley |
|
Lower Carmel Valley |
|
|
Y (Missing from file when Archived) |
| 1986 |
January |
Ricker, Michael |
MPWMD |
Water Conservation Plan for Monterey County (see August 1987 for revised version) |
Final |
Monterey County |
Water Quantity |
Management |
|
| 1986 |
January |
|
MPWMD |
Carmel River Management Program Schulte Restoration Project |
|
Carmel River |
|
Management |
|
| 1986 |
January |
|
Rogers E. Johnson & Assoc |
Preliminary Report of Landsliding in the Vicinity of the Proposed New San Clemente Reservoir |
|
San Clemente Dam |
|
|
|
| 1986 |
February |
Dryden, Frank |
|
Evaluation of Alternative Water Reuse Projectsor the Monterey Peninsula |
Draft |
Monterey Peninsula |
|
|
|
| 1986 |
February |
|
US Army Corps of Engineers |
Long-Range Water Supply Development for FoOrd California |
|
Fort Ord |
Water Quantity |
|
|
| 1986 |
February |
|
EIP Associates |
New San Clemente Dam EIR |
Draft |
San Clemente Dam |
|
|
|
| 1986 |
February |
Matthews, W.G.V. and Kondolf, G. Mathias |
|
Transport of Tracer Gravels on a Coastal California River (Journal of Hydrology 85 pp.265-280) |
|
|
|
|
|
| 1986 |
March |
Dryden, Frank |
|
Evaluation of Alternative Water Reuse Projects for the Monterey Peninsula |
Final |
Monterey Peninsula |
|
|
|
| 1986 |
April |
McNiesh, Charles M. |
|
Effects of Production Well Pumping on Plant Water Stress in the Riparian Corridor of the Lower Carmel Valley; Volumes 1 2 and 3 |
Draft |
Lower Carmel Valley |
Riparian |
Groundwater |
|
| 1986 |
April |
Oliver, Joseph |
MPWMD |
Technical Memorandum 86-02 - Procedure Outline for |
Draft |
|
|
|
|
| 1986 |
April |
Oliver, Joseph and Litwin, Yoram |
MPWMD |
Technical Memorandum 86-03 - Compilation of Ground Water Data for Calibration of the Carmel Valley Simulation Modelf |
|
Carmel Valley |
Groundwater |
|
|
| 1986 |
April |
Oliver, Joseph |
MPWMD |
Technical Memorandum 86-01, Carmel Valley Ground Water Storage Calculation |
Draft |
Carmel Valley |
Groundwater |
|
|
| 1986 |
May |
|
MPWMD |
MPWMD Projections |
Draft |
|
|
|
|
| 1986 |
May |
Buel, Bruce |
MPWMD |
1986-87 Water Supply Strategy |
|
|
Water Quantity |
|
|
| 1986 |
May |
|
Sutro & Co. Inc. |
San Clemente Water Revenue Bonds Finance Report |
|
San Clemente Dam |
|
|
|
| 1986 |
June |
|
D.W. Kelley & Associates |
Report on Field Reconnaissance and Review of Downstream Fish Passage Facilities at Reservoirs on the Santiam and North Fork Clackamas Rivers in Oregon |
|
Santiam and North Fork Clackamas Rivers, Oregon |
Wildlife Habitat |
|
|
| 1986 |
June |
|
Converse Consultants |
New San Clemente Project Preliminary Design and Cost Estimate |
Draft |
San Clemente Dam |
|
|
|
| 1986 |
June |
Stern, Henrietta |
MPWMD |
Application for 404 Permit and Draft Notice of Intent |
|
|
|
|
|
| 1986 |
July |
|
D.W. Kelley & Associates |
Relationships Between Steelhead Sport Catch Angling Success and Stream Flow |
|
|
Wildlife Habitat |
Steelhead |
|
| 1986 |
July |
Oliver, Joseph |
MPWMD |
Draft Technical Memorandum 86-04 Estimation of Ground-Water Outflow From Aquifer Sub-Units Carmel Valley Simulation Model |
Draft |
Carmel Valley |
Groundwater |
|
|
| 1986 |
July |
Fuerst and Greenwood |
MPWMD |
Technical Memorandum 86-05 Private Pumpage from the Carmel Valley and Seaside Aquifers |
Draft |
Seaside |
Groundwater |
|
|
| 1986 |
July |
Fuerst and Greenwood |
MPWMD |
Technical Memorandum 86-05 Private Pumpage from the Carmel Valley and Seaside Aquifers |
Final |
Seaside |
Groundwater |
|
|
| 1986 |
July |
Finnigan, James |
MPWMD |
Final Technical Memorandum 86-07 Sediment Carrying Capacity of the Carmel River at Via Mallorca Bridge |
|
Via Mallorca Bridge |
Sediment Transport |
|
|
| 1986 |
July |
Finnigan, James |
MPWMD |
Average Daily Temperatures at San Clemente Dam |
|
San Clemente Dam |
|
|
|
| 1986 |
July |
Finnigan, James |
MPWMD |
Staff's Response to New San Clemente Dam Project Preliminary Design and Cost Estimate, Converse Consultants, June 1986 |
|
San Clemente Dam |
|
|
|
| 1986 |
July |
|
EIP Associates |
Growth Impacts Study for the San Clemente Dam Public Workshop |
|
San Clemente Dam |
Wildlife Habitat |
|
|
| 1986 |
August |
Stern, Henrietta |
MPWMD |
Monterey County Fair Handouts |
|
Monterey County |
|
|
|
| 1986 |
August |
Stern, Henrietta |
MPWMD |
Evaluation of Water Supply Alternatives for the Monterey Peninsula |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1986 |
August |
|
Staal Gardner & Dunne Inc |
Phase I Hydrogeologic Assessment Laguna Seca |
Final |
Laguna Seca |
|
|
|
| 1986 |
August |
|
EIP Associates |
Growth Impacts Study for the San Clemente Dam |
Draft |
San Clemente Dam |
Wildlife Habitat |
|
|
| 1986 |
August |
|
Staal Gardner & Dunne Inc |
Phase I Hydrogeologic Assessment Laguna Seca |
Final |
Laguna Seca |
|
|
|
| 1986 |
August |
|
DeLay Laredo & McGowan |
NEPA Alternatives Analysis |
|
|
|
|
|
| 1986 |
September |
|
D.W. Kelley & Associates |
Assessment of the Carmel River Steelhead Resource - Volume |
|
Carmel River |
Wildlife Habitat |
Steelhead |
|
| 1986 |
September |
|
Rogers E. Johnson & Assoc |
C14 Dates from Exploratory Trenches New San Clemente |
|
San Clemente Dam |
|
|
|
| 1986 |
September |
Oliver and Fuerst |
MPWMD |
Technical Memorandum 86-06- Pumping Capacity as a |
Draft |
|
Groundwater |
|
|
| 1986 |
October |
Williams, John |
MPWMD |
Photodocumentation of the Effects of Well Pumping on |
|
|
Groundwater |
|
|
| 1986 |
October |
Stern, Henrietta |
MPWMD |
Evaluation of Water Supply Alternatives for the |
Draft |
|
Water Quantity |
|
|
| 1986 |
November |
|
EIP Associates |
Interim Growth Impacts Study for the San Clemente Dam |
|
San Clemente Dam |
|
|
|
| 1986 |
November |
|
Converse Consultants |
New San Clemente Project Preliminary Design and |
Final |
San Clemente Dam |
|
|
|
| 1986 |
November |
Stern, Henrietta |
MPWMD |
Technical Memorandum 86-08 Development of Water Demand |
|
|
Water Quantity |
|
|
| 1986 |
December |
Greenwood, Ken |
MPWMD |
Carmel River Watershed Management Plan |
Draft |
Carmel River |
|
|
|
| 1987 |
January |
Greenwood, Ken |
MPWMD |
Appendices to Draft CRWMP |
|
|
|
|
|
| 1987 |
January |
|
Fort Ord |
Department of the Army License for Fort Ord Monitor Wells |
|
Fort Ord |
|
|
|
| 1987 |
January |
|
Staal Gardner & Dunne Inc |
Fort Ord Ground Water Monitoring Well Project |
|
Fort Ord |
Groundwater |
|
|
| 1987 |
January |
Heuer, Dick |
MPWMD |
Statement to Mayors' Select Committee |
|
|
|
|
|
| 1987 |
January |
Stern, Henrietta |
MPWMD |
Evaluation of Water Supply Alternatives for the Monterey Peninsula |
Final |
Monterey Peninsula |
Water Quantity |
|
|
| 1987 |
February |
|
|
MPWMD Law (West's Annotated California Water Water) |
|
|
|
|
|
| 1987 |
April |
|
D.W. Kelley & Associates |
Preservation of Carmel River Steelhead with Fish Passage Facilities over San Clemente Dam or with a Hatchery Near Its Base |
|
San Clemente Dam |
Wildlife Habitat |
Steelhead |
|
| 1987 |
April |
|
Converse Consultants |
New San Clemente Project Preliminary Design and Cost Estimate Fish Conveyance Facilities |
Draft |
San Clemente Dam |
|
|
|
| 1987 |
April |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Assessment Monterey Sand Company, Metz Road Well Sand City California |
|
Sand City |
|
|
|
| 1987 |
May |
|
Converse Consultants |
New San Clemente Project Preliminary Design and Cost Estimate; Fish Conveyance Facilities |
Final |
San Clemente Dam |
|
|
|
| 1987 |
May |
|
Converse Consultants |
New San Clemente Project Engineering Summaries of Additional EIR Alternatives |
|
San Clemente Dam |
|
|
|
| 1987 |
May |
|
Converse Consultants |
New San Clemente Project Dam Break Study Report |
|
San Clemente Dam |
|
|
|
| 1987 |
May |
Stern, Henrietta |
MPWMD |
Supplementary Evaluation of Water Supply Alternatives For the Monterey Peninsula |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1987 |
May |
|
Archaeological Consulting |
Archaeological and Historical Investigations for the San |
|
|
|
|
|
| 1987 |
May |
|
MPWMD |
Hydrogeologic Investigation, Seaside Coastal Ground Water |
|
Seaside |
Groundwater |
|
|
| 1987 |
May |
Oliver, Joseph |
MPWMD |
Technical Memorandum 87-09, Summary of Seaside Coastal Ground Water Basin Evaluation |
|
Seaside |
Groundwater |
|
|
| 1987 |
June |
Stern, Henrietta |
MPWMD |
Technical Memorandum 87-15, Description of New San Clemente Project and "No Project" Conditions |
Draft |
San Clemente Dam |
|
|
|
| 1987 |
June |
|
D.W. Kelley & Associates |
Assessment of the Carmel River Steelhead Resource, Volume II, Evaluation of the Effects of Alternative Water Supply Projects on the Carmel River Steelhead Resource |
|
Carmel River |
Water Quantity |
Steelhead |
|
| 1987 |
June |
Oliver, Joseph |
MPWMD |
Technical Memorandum 87-10, Effects on the Upper Carmel Valley Aquifer from Additional Well Development |
|
Upper Carmel Valley |
Groundwater |
|
|
| 1987 |
June |
Roberson, D., and Roberson, R. |
|
Carmel River Bird Survey |
|
Carmel River |
Wildlife Habitat |
|
|
| 1987 |
June |
Matthews, Graham |
MPWMD |
Technical Memorandum 87-13 Evaluation of the Effects of the Feasible New San Clemente Project Alternatives on the Channel Stability and Sediment Transport of the Carmel River |
Draft |
San Clemente Dam |
Sediment Transport |
|
|
| 1987 |
July |
|
EIP Associates |
New San Clemente Project |
Administrative Draft EIR/EIS |
San Clemente Dam |
|
|
|
| 1987 |
July |
Buel, Bruce |
MPWMD |
Development of Distribution Concept Allotments for Allocation System EIR |
|
|
|
|
|
| 1987 |
August |
Ricker, Michael |
MPWMD |
Water Conservation Plan for Monterey County (Current in Effect) |
|
Monterey County |
Water Quantity |
|
|
| 1987 |
August |
|
D.W. Kelley & Associates |
Assessment of the Carmel River Steelhead Resource |
Supplement to Volume II |
Carmel River |
Wildlife Habitat |
Steelhead |
|
| 1987 |
August |
Thorton, Edward B. |
|
Impacts on Carmel River State Beach Due to the New San |
|
Carmel River State Beach |
|
|
|
| 1987 |
September |
Fuerst, D. and Litwin, Y. |
MPWMD |
Overview of Carmel Valley Simulation Model |
|
Carmel Valley |
|
|
|
| 1987 |
September |
|
EIP Associates |
New San Clemente Project |
Draft EIR/EIS |
San Clemente Dam |
|
|
|
| 1987 |
September |
|
EIP Associates |
Appendices |
Draft EIR/EIS |
|
|
|
|
| 1987 |
September |
|
EIP Associates |
Summary, New San Clemente Project EIR/EIS |
|
San Clemente Dam |
|
|
|
| 1987 |
September |
Stern, Henrietta |
MPWMD |
New San Clemente Project, Summary of Facts |
|
San Clemente Dam |
|
|
|
| 1987 |
September |
Fuerst, D. W. |
MPWMD |
Attachment A, Determination of Water Supply Categories for the Monterey Peninsula Water Resources System |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1987 |
September |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Investigation Phase II Point Lobos Ranch Water Supply Study Monterey Co. CA |
Draft |
Point Lobos Ranch |
Water Quantity |
|
|
| 1987 |
October |
|
Planning Analysis & Development |
Water Allocation Program |
Administrative Draft |
|
|
|
|
| 1987 |
October |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Investigation Phase II Point Lobos Ranch |
|
Point Lobos Ranch |
|
|
|
| 1987 |
October |
|
D.W. Kelley & Associates |
Assessment of The Carmel River Steelhead Resource, Volume II, Evaluation of the Effects of Alternative Water Supply Projects on the Carmel River Steelhead Resource |
Final |
Carmel River |
Water Quantity |
Steelhead |
|
| 1987 |
October |
Oliver, Joseph |
MPWMD |
Technical Memorandum 87-17: Procedures Simulating Water Level Drawdowns in the Carmel Valley Aquifer Under Different Water Supply System Production Conditions |
Draft |
Carmel Valley |
Water Quantity |
Groundwater |
|
| 1987 |
November |
Stern, Henrietta |
MPWMD |
Written and Oral Comments on New San Clemente Project Draft EIR/EIS |
|
San Clemente Dam |
|
|
|
| 1987 |
November |
|
CESAND |
Permit System Users Manual |
|
|
|
|
|
| 1987 |
November |
|
CESAND |
Water Permit System Technical Documentation |
|
|
|
|
|
| 1988 |
January |
|
CAL-AM Water Company |
Report on the Results of Operations and Revenue Requirements |
|
|
|
|
|
| 1988 |
February |
Stern, Henrietta |
MPWMD |
Proposed Concept for Selection of Practicable Alternatives, The New San Clemente Project Supplementary Draft EIR/EIS |
|
San Clemente Dam |
|
|
|
| 1988 |
March |
|
Planning Analysis & Development |
Water Allocation Program EIR |
Draft |
|
|
|
|
| 1988 |
March |
Stern, Henrietta |
MPWMD |
Summary of Agency Comments on Alternatives Proposal and District Responses |
|
|
|
|
|
| 1988 |
March |
Buel, Bruce |
MPWMD |
Proposed Process for Screening of Monterey Peninsula Water Supply Alternatives |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1988 |
March |
|
MPWMD |
MPWMD Staff Recommendations Re: Alternatives for |
Draft |
|
|
|
|
| 1988 |
April |
|
EIP Associates |
Estimates of Housing and Employment at Buildout within the Monterey Peninsula Water Management District |
|
Monterey Peninsula |
|
|
|
| 1988 |
April |
Greenwood, Ken |
MPWMD |
Carmel River Watershed Management Plan |
Conceptual Draft |
Carmel River |
|
|
|
| 1988 |
May |
|
Calif. Department of |
Report to the California Water Commission. Department of |
|
|
|
|
|
| 1988 |
May |
|
J. Laurence Mintier & Assoc |
Water Supply and Water Distribution Options. Draft Allocation Program EIR Phase I |
Draft |
|
Water Quantity |
|
|
| 1988 |
May |
|
MPWMD |
Evaluation of Water Supply Alternatives for the New San Clemente Project Supplemental Draft Environmental Impact Report and Statement. Part I: Assessment of Practicability |
Draft |
San Clemente Dam |
Water Quantity |
|
|
| 1988 |
June |
|
Bechtel Civil Inc. |
New San Clemente Dam Project Evaluation of Slope Stability in the Reservoir Area |
|
San Clemente Dam |
|
|
|
| 1988 |
June |
|
Bechtel Civil Inc. |
New San Clemente Dam Project Seismic Design Criteria, Review of Previous Studies and Preliminary Recommendations |
|
San Clemente Dam |
|
|
|
| 1988 |
July |
|
EIP Associates |
Estimates of Housing and Employment at Buildout Within the Monterey Peninsula Water Management District |
Final |
Monterey Peninsula |
|
|
|
| 1988 |
August |
|
MPWMD |
Interim Relief Plan |
Draft 2 |
|
|
|
|
| 1988 |
September |
|
MPWMD |
Interim Relief Plan |
|
|
|
|
|
| 1988 |
September |
|
EIP Associates |
Riparian Habitat Assessment. Alternatives of the New San Clemente Dam Project |
|
San Clemente Dam |
Riparian |
|
|
| 1988 |
September |
|
MPWMD |
Evaluation of Water Supply Alternatives for the New San Clemente Project Supplemental Draft Environmental Impact Report and Statement, Part I: Assessment of Practicability |
Final |
San Clemente Dam |
Water Quantity |
|
|
| 1988 |
September |
|
Archaeological Consulting |
Preliminary Cultural Resources Reconnaissance of Erosion Control Projects Carmel River Monterey County California |
|
Carmel River |
Erosion |
Cultural Resources |
|
| 1988 |
October |
|
J. Laurence Mintier & Assoc |
Water Supply and Water Distribution Options. Draft Allocation Program EIR Phase II - Revised Draft |
Draft |
|
Water Quantity |
|
|
| 1988 |
October |
McNiesh, Charles M. |
|
A Methodology for Predicting Riparian Vegetation Impacts Due to Pumping the Carmel Valley Aquifer |
|
Carmel Valley |
Riparian |
|
|
| 1988 |
October |
|
DMC Energy Inc. |
Monterey Peninsula Water Corps Preliminary Summary |
|
Monterey Peninsula |
|
|
|
| 1988 |
November |
|
MPWMD |
Evaluation of Water Supply Alternatives for the New San Clemente Project Supplemental Draft Environmental Impact Report and Statement. Part II: Assessment of Performance |
Draft |
San Clemente Dam |
Water Quantity |
|
|
| 1988 |
November |
|
DMC Energy Inc. |
Monterey Peninsula Retrofit Program |
Final |
Monterey Peninsula |
|
|
|
| 1988 |
November |
Matthews, M. A. |
|
Plant Survey Carmel River Mid Valley Area |
|
Carmel River, Mid Valley |
Riparian |
|
|
| 1989 |
January |
McNiesh, Charles M. |
|
An Inventory of the Riparian Vegetation Resource of the Carmel Valley |
|
Carmel Valley |
Riparian |
|
|
| 1989 |
February |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Assessment, Ryan Ranch Mutual Water Company, Construction of Well Nos. 9 & 10 Monterey Research Park, Monterey County California |
|
Ryan Ranch |
|
|
|
| 1989 |
February |
Matthews, Graham |
MPWMD |
Technical Memorandum 88-03, Evaluation of Reservoir Sedimentation Rates in the Upper Carmel River Watershed |
|
Upper Carmel River |
Sediment Transport |
|
|
| 1989 |
March |
|
J. Laurence Mintier & Assoc Jones & Stokes Assoc D.W. Kelley & Assoc and Water Resource Associates |
Draft Environmental Impact Report; Water Allocation Program |
Draft EIR |
|
|
|
|
| 1989 |
March |
Clark, Joseph C. |
|
Geologic Analysis of the Cypress Point Fault in the Vicinity of the Lower Carmel River Valley |
|
Lower Carmel Valley River |
|
|
|
| 1989 |
March |
|
Bechtel Civil Inc. |
New San Clemente Dam Downstream Migrant Collection Facilities Pine Creek Fish Screening Structure |
|
San Clemente Dam |
Wildlife Habitat |
|
|
| 1989 |
March |
|
MPWMD Lead Agency Carmel Sanitary District Marina County Water District Pebble Beach Community Services District Monterey Regional Water Pollution Control Agency Monterey Co. Flood Control & Water Conservation District |
Water Conservation Plan for Monterey County |
|
Monterey County |
|
|
|
| 1989 |
March |
|
Denise Duffy & Associates |
CSD/PBCSD Wastewater Reclamation Project |
Draft EIR |
|
|
|
|
| 1989 |
May |
|
Archaeological Consulting |
Archaeological Literature Study and Mitigation Recommendations for the Cañada de la Segunda Reservoir Carmel Valley Monterey County California |
|
Cañada de la Segunda Reservoir |
|
|
|
| 1989 |
May |
Bell, Andrew |
MPWMD |
Technical Memorandum 89-04; Analysis of New Los Padres Reservoir Rim Dam Concept |
|
Los Padres Dam |
|
|
|
| 1989 |
May |
Mello, Henry |
|
Public Hearing on the MPWMD |
|
|
|
|
|
| 1989 |
May |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Investigation Carmel River Aquifer Coastal Portion Monterey County CA |
|
Carmel River Aquifer, Coastal Portion |
Groundwater |
|
|
| 1989 |
June |
|
Archaeological Consulting |
Cultural Resources Literature Study and Mitigation Recommendations for Phase II of the New San Clemente Project EIR/EIS Carmel Valley Monterey County CA |
|
San Clemente Dam |
Cultural Resources |
|
|
| 1989 |
June |
|
Bechtel Civil Inc. |
Monterey Peninsula Water Supply Project New Los Padres New San Clemente and San Clemente Creek Projects Preliminary Designs and Cost Estimates |
|
Los Padres Dam |
Water Quantity |
|
|
| 1989 |
June |
|
Bechtel Civil Inc. |
Monterey Peninsula Water Supply Project New San Clemente Site Downstream Migrant Steelhead Screening Facility Collection Efficiency |
|
San Clemente Dam |
Water Quantity |
Steelhead |
|
| 1989 |
June |
|
Denise Duffy & Associates |
CSD/PBCSD Wastewater Reclamation Project |
Final EIR |
|
|
|
|
| 1989 |
July |
|
BioSystems Analysis Inc . |
Cañada Reservoir Project Preliminary Biological Assessment |
|
Cañada Reservoir |
Wildlife Habitat |
|
|
| 1989 |
July |
|
Norman Janke Associates |
Evaluation of Regional and Local Seismicity for the Cañada Reservoir Carmel Valley CA |
|
Cañada Reservoir |
|
|
|
| 1989 |
July |
|
Rivertech Inc. |
Mechanics of Carmel River at Williams Ranch, A Reconnaissance Level Study |
|
Williams Ranch |
|
|
|
| 1989 |
July |
|
Grice Engineering Inc. |
Preliminary Evaluation of the Incorporated Embankment Site & Reservoir Area for Cañada Reservoir Phase 1A |
|
Cañada Reservoir |
|
|
|
| 1989 |
August |
Williams, John |
Philip Williams & Associates |
Carmel River Lagoon Enhancement Plan. Report on Potential Mitigation Sites |
|
Carmel River Lagoon |
|
|
|
| 1989 |
August |
|
Denise Duffy & Associates |
Preliminary Environmental Assessment of Cañada Reservoir |
|
Canada Reservior |
|
|
|
| 1989 |
August |
Stern, Henrietta |
MPWMD |
Technical Memorandum 89-06 Development of Water Demand Estimates at Buildout for the Monterey Peninsula Water Supply Project EIR/EIS |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1989 |
September |
|
MPWMD/Compagno |
MPWMD/Lease-Anthony S. Compagno & Catherine |
|
|
|
|
|
| 1989 |
October |
|
Water Resource Association Consulting Engineers |
Preliminary Hydrologic Study for Cañada Reservoir |
|
Cañada Reservoir |
|
|
|
| 1989 |
October |
Dettman, D. |
MPWMD |
Technical Meomorandum 89-05 Evaluation of Instream Flow |
|
|
|
|
|
| 1989 |
October |
|
Denise Duffy & Associates |
Cañada Reservoir Project Cost Estimate |
|
Cañada Reservoir |
|
|
|
| 1989 |
November |
Dettman, D. |
MPWMD |
Technical Memorandum 89-03 The Quantity of Steelhead Spawning Habitat Inundated or Blocked by Alternative Water Supply Projects in the Carmel River Basin |
|
Carmel River |
Water Quantity |
Steelhead |
|
| 1989 |
November |
|
MPWMD |
Memorandum: Water Supply Status as of November 1 1989 |
|
|
Water Quantity |
|
|
| 1989 |
November |
Oliver, Joseph |
MPWMD |
Technical Memorandum 89-08 Hydrology of the Carmel River Lagoon |
|
Carmel River Lagoon |
|
|
|
| 1989 |
November |
Alley, Donald |
|
Preliminary Draft Instream Flow Requirements Steelhead Spawning and Rearing Carmel River Monterey County, 1989 |
|
Carmel River |
Wildlife Habitat |
Steelhead |
|
| 1989 |
November |
|
Western Ecological Services |
Cañada Reservoir Project Preliminary Fisheries Assessment |
|
Cañada Reservoir |
Wildlife Habitat |
|
|
| 1989 |
November |
|
Denise Duffy & Associates |
Preliminary Environmental Assessment of Cañada Reservoir, Part II |
|
Cañada Reservoir |
|
|
|
| 1989 |
December |
|
Grand Jury |
Grand Jury Report 1989 |
|
|
|
|
|
| 1990 |
January |
|
Grand Jury |
Response to Grand Jury Report |
|
|
|
|
|
| 1990 |
January |
|
J. Laurence Mintier & Assoc Jones & Stokes Assoc D.W. Kelley & Assoc and Water Resource Associates |
Administrative Draft Final Environmental Impact Report, Volume 1 Appendices, Water Allocation Program |
Administrative Draft Final EIR |
|
|
|
|
| 1990 |
January |
|
J. Laurence Mintier & Assoc Jones & Stokes Assoc |
Administrative Draft Final Environmental Impact Report, Volume 1 |
Administrative Draft Final EIR |
|
|
|
|
| 1990 |
January |
|
D.W. Kelley & Associates and Water Resource Associates |
Water Allocation Program |
|
|
|
|
|
| 1990 |
January |
|
Parton & Edwards Construction Inc. |
Drinking Water Supply System for Monterra Ranch Project |
|
Monterra Ranch |
Water Quantity |
|
|
| 1990 |
January |
|
Bechtel Civil Inc. |
Cañada Reservoir Project Analysis of Alternative Ownership Options |
|
Cañada Reservoir |
|
|
|
| 1990 |
March |
|
Rationing Review Committee |
Final Report of the Rationing Review Committee |
Final |
|
|
|
|
| 1990 |
March |
Fuerst, D. W. |
MPWMD |
Technical Memorandum 90-05, Estimated Pumping Capacities for Production Wells Operated by the California-American Water Company Monterey District |
|
|
|
|
|
| 1990 |
April |
|
J. Lawrence Mintier & Associates |
Final Environmental Impact Report Volume I Water Allocation Program |
Final EIR |
|
|
|
|
| 1990 |
April |
|
J. Lawrence Mintier & Associates |
Final Environmental Impact Report Volume II - WaterAllocation Program |
Final EIR |
|
|
|
|
| 1990 |
April |
|
J. Lawrence Mintier & Associates |
Summary of Water Allocation Program EIR |
|
|
|
|
|
| 1990 |
April |
Montgomery, James M. |
James M. Montgomery Consulting Engineers |
American Water Works Service Co. Playa Well #4 Water |
|
|
Groundwater |
|
|
| 1990 |
April |
|
MPWMD |
Water Allocation Program EIR - A Summary of Issues Impacts & Process To Be Followed |
|
|
|
|
|
| 1990 |
May |
|
Engineering Science Inc., MPWMD |
CAWD/PBCSD Water Reclamation Project Pacific Grove Extension |
|
|
|
|
|
| 1990 |
June |
Buel, Bruce |
MPWMD |
1990 - 1995 Capital Improvement Plan and Present Worth Primer (March 1990) |
Draft |
|
|
|
|
| 1990 |
June |
Laclergue, Bruce |
MPWMD |
MPWMD Planning Memorandum #90-91 Reservoir Clearing and Grubbing for the New Los Padres Project |
|
Los Padres Dam |
|
|
|
| 1990 |
July |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Investigation PCA Well Aquifer Test Sand City CA (draft) |
|
Sand City |
Groundwater |
|
|
| 1990 |
July |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Investigation PCA Well Aquifer Test Sand City California |
|
San City |
Groundwater |
|
|
| 1990 |
July |
|
Staal Gardner & Dunne Inc |
Installation of Monitoring Well Cluster Monterey Sand Co. Sand City Monterey County CA |
|
Sand City |
Groundwater |
|
|
| 1990 |
July |
|
Staal Gardner & Dunne Inc |
Installation of Deep Monitoring Well California American Water Co. Plumas Site City of Seaside Monterey County CA |
|
Seaside |
|
|
|
| 1990 |
July |
|
The Habitat Restoration Group |
Instream Flow Analysis of Steelhead Spawning & Rearing |
|
|
Wildlife Habitat |
Steelhead |
|
| 1990 |
July |
|
Staal Gardner & Dunne Inc |
Summary of Operations Paralta Test Well Seaside California |
|
Seaside |
|
|
|
| 1990 |
August |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Update Seaside Coastal Ground Water Basins Monterey County CA |
|
Seaside |
Groundwater |
|
|
| 1990 |
August |
|
Woodward-Clyde Consultants Bartle Wells Associates |
MCFCWCD Water Capital Facilities Plan Volume I (draft 72) |
|
|
|
|
|
| 1990 |
August |
Oliver, Joseph |
MPWMD |
Summary of Carmel Valley Aquifer Ground Water Quality From Coastal Monitor Wells |
|
Carmel Valley |
Water Quality |
Groundwater |
|
| 1990 |
August |
Dettman, D. |
MPWMD |
Technical Memorandum 90-01 Spawning Habitat Mitigation Plans for Alternative Water Supply Projects in the Carmel River Basin |
|
Carmel River |
Water Quantity |
|
|
| 1990 |
September |
Cofer, Jim |
MPWMD |
Proposed Five Year Capital Facilities Plan |
|
|
|
|
|
| 1990 |
September |
|
MPWMD |
Proposed Seawater Desalination Program |
|
|
Desalination |
|
|
| 1990 |
September |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Investigation Monterey Coastal Basin Monterey County California |
|
Monterey Coastal Basin |
|
|
|
| 1990 |
October |
Williams, John G. |
|
Carmel River Lagoon & Wetland Enhancement Plan |
Preliminary Draft |
Carmel River Lagoon |
|
|
|
| 1990 |
October |
|
MPWMD |
MPWMD Final Five-Year Mitigation Plan For Option V-- 16700 AF CAL-AM Production |
|
|
|
|
|
| 1990 |
October |
|
Ad Hoc Water Committee |
Report of Ad Hoc Water Allocation Committee |
|
|
|
|
|
| 1990 |
October |
|
Graham Matthews & Asso. |
Potential Changes in Water Surface Profiles after Dam Construction in the Carmel River Watershed |
|
Carmel River |
|
|
|
| 1990 |
November |
McNiesh, Charles M. |
|
Projected Riparian Vegetation Impacts Under the Various MPWSP EIR/EIS Alternatives |
Draft |
|
Riparian |
|
|
| 1990 |
November |
|
Board of Directors |
Attachment E - Findings of the Board of Directors of the MPWMD for Certification of the Final Water Allocation Program and for Adoption of the Water Allocation Program |
|
|
|
|
|
| 1990 |
November |
|
MPWMD |
Final Five Year Mitigation Program for Option V--16700 AF Cal-Am Production Water Allocation Program |
|
|
|
|
|
| 1990 |
November |
Dettman, D. |
MPWMD |
Technical Memorandum 90-03/The Quantity of Steelhead Rearing Habitat Inundated or Blocked by Alternative Water Supply Projects in the Carmel River Basin |
|
Carmel River |
Water Quantity |
Steelhead |
|
| 1990 |
December |
Kondolf, G. Mathias and Matthews, Graham |
|
Assessment of Potential Impacts of Monterey Peninsula Water Supply Project on Downstream Channel Geomorphology of the Carmel River |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1990 |
December |
|
Staal Gardner & Dunne Inc |
Summary of Operations Del Rey Oaks No. 1 Test Well |
|
Del Ray Oaks |
Groundwater |
|
|
| 1990 |
December |
|
Grand Jury |
Grand Jury Final Report |
|
|
|
|
|
| 1990 |
December |
Matthews, W.V. Graham, III |
|
Design of River Restoration Projects on Gravel-Bed Rivers Emphasizing Riparian Revegetation -- M.S. Thesis Earth |
|
|
Riparian |
|
|
| 1991 |
January |
Adams, E. and Fernandes, L. |
Wells Fargo Bank Private Banking |
Liquidity Management Services |
|
|
|
|
|
| 1991 |
January |
|
Bechtel Corporation |
MPWSP New Los Padres & New San Clemente Projects Fish Collection Facilities Conceptual Designs and Cost Estimates |
|
Los Padres Dam |
|
|
|
| 1991 |
March |
McNiesh, Charles M. |
|
Projected Riparian Vegetation Impacts Along The Carmel River Under Eleven Water Supply Project Alternatives |
|
Carmel Valley |
Water Quantity |
Riparian |
|
| 1991 |
March |
McNiesh, Charles M. |
|
Irrigating Riparian Vegetation In The Carmel Valley California-A Preliminary Report of Findings Appendix I: Tables, Appendix II: Figures |
|
Carmel Valley |
Riparian |
|
|
| 1991 |
April |
|
Denise Duffy & Associates (prepared for Cal-AM) |
Environmental Assessment of the Cañada Reservoir Project |
|
Cañada Reservoir |
|
|
|
|
|
Freidland, Dave, and Davis, John |
EIP Associates |
Administrative Draft Environmental Impact Report/Statement Volume I II & Appendices |
|
|
|
|
|
| 1991 |
April |
|
MPWMD |
Technical Memorandum 91-01 Documentation of Production |
|
|
|
|
|
| 1991 |
April |
|
Boyle Engineering |
MPWMD Desalination Feasibility Study Status Report on Site Evaluation |
|
|
Desalination |
|
|
| 1991 |
April |
|
Staal Gardner & Dunne Inc |
Hydrogeologic Simulation - Carmel Valley Aquifer System - |
|
Carmel Valley Aquifer |
Groundwater |
|
|
| 1991 |
May |
|
Philip Williams & Assoc Ltd |
Carmel River Lagoon Enhancement Plan |
Draft |
Carmel River Lagoon |
|
|
|
| 1991 |
June |
Mercurio, Ed |
|
San Clemente Project Job No. 89090 |
|
San Clemente Dam |
|
|
|
| 1991 |
June |
|
Woodward-Clyde Consultants |
Desalination Water Supply Project Permitting Requirements Analysis |
|
|
Desalination |
|
|
| 1991 |
July |
Hamilton, Robert, Laughlin, Jack, and Morin, O.J. |
|
MPWMD Desalination Feasibility Study Moss Landing Site |
|
Moss Landing |
Desalination |
|
|
| 1991 |
July |
|
Boyle Engineering |
MPWMD Desalination Feasibility Study |
|
|
Desalination |
|
|
| 1991 |
July |
|
Graham Matthews & Asso., MPWMD |
Draft Riparian Habitat Mitigation Plan for the Monterey |
|
|
Riparian |
|
|
| 1991 |
August |
Fuerst, D. W. |
MPWMD |
MPWMD Technical Memorandum 91-03 Overview of the Carmel Valley Simulation Model ADDENDUM |
|
Carmel Valley |
|
|
|
| 1991 |
August |
|
MPWMD |
Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project Volume I |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1991 |
August |
|
MPWMD |
Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project Volume II |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1991 |
August |
|
MPWMD |
Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project Appendices |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1991 |
August |
Stern, Henrietta |
MPWMD |
Executive Summary of the Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1991 |
September |
McNiesh, Charles M. |
|
Irrigating Riparian Vegetation in the Carmel Valley CA. Volumes I: Text; Volume II: Tables & Figures; Volume III: |
|
Carmel Valley |
Riparian |
|
|
| 1991 |
September |
Oliver, Joseph |
MPWMD |
MPWMD Technical Memorandum 91-03 - Summary of September Ranch Well Aquifer Test |
|
September Ranch |
Groundwater |
|
|
| 1991 |
October |
|
EIP Associates |
Biological Resource Evaluation for the Desalination Component of the Monterey Peninsula Water Supply Project |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1991 |
November |
Dettman, D. |
MPWMD |
Technical Memorandum 91-04/Development of a Substrate |
|
|
|
|
|
| 1991 |
December |
|
Brown & Caldwell |
San Clemente Reservoir Safe Yield Analysis Phase I, California; American Water Company |
|
San Clemente Dam |
|
|
|
| 1991 |
December |
|
Grand Jury |
Monterey County Grand Jury Final Report 1991 |
|
|
|
|
|
| 1991 |
December |
Williams, John |
Philip Williams & Associates |
Carmel River Lagoon Enhancement Plan |
Draft |
Carmel River Lagoon |
|
|
|
| 1992 |
January |
|
K2 Environmental |
Carmel Valley Groundwater Quality Evaluation |
|
Carmel Valley |
Groundwater |
|
|
| 1992 |
January |
|
MPWMD |
1991 Annual Report for the Five Year Mitigation Program |
|
|
|
|
|
| 1992 |
January |
|
Bartle Wells Associates |
Preliminary Phase I - Revenue and Financing for Water Management Facilities |
|
|
Management |
|
|
| 1992 |
February |
|
Staal Gardner & Dunne Inc |
Preliminary Feasibility Study Saline Ground Water Intake System Sand City California |
|
Sand City |
Groundwater |
|
|
| 1992 |
March |
|
Archaeological Consulting |
Preliminary Cultural Resources Reconnaissance for the MPWMD Desalination Pipeline Monterey County California |
|
Monterey County |
Desalination |
Cultural Resources |
|
| 1992 |
March |
|
JMM Consulting Engineers |
Desalination Preliminary Design |
Final Report |
|
Desalination |
|
|
| 1992 |
April |
|
EIP Associates |
Near-Term Desalination Project |
Draft EIR |
|
Desalination |
|
|
| 1992 |
May |
|
MPWMD |
Final Phase III Water Rationing MPWMD |
|
|
|
|
|
| 1992 |
June |
|
D. W. Alley & Associates |
Instream Flow Analysis of Steelhead Spawning Habitat |
|
|
Wildlife Habitat |
Steelhead |
|
| 1992 |
June |
|
Archaeological Consulting |
Cultural Resources Reconnaissance of the New Los Padres Dam and Reservoir Project Carmel Valley Monterey County California (Revised July 21 1992) |
|
Los Padres Dam |
Cultural Resources |
|
|
| 1992 |
June |
|
Archaeological Consulting |
Appendix 1, Cultural Resource Site Records to Accompany Supplement to Cultural Resources Reconnaissance of the New Los Padres Dam and Reservoir Project Carmel Valley, Monterey County CA |
|
Los Padres Dam |
Cultural Resources |
|
|
| 1992 |
June |
|
Bartle Wells Associates |
Phase II Report Financing & Implementation for Water |
|
|
|
|
|
| 1992 |
June |
|
EIP Associates |
MPWMD New Los Padres Dam Project; Upland Mitigation Plan |
Preliminary Draft |
Los Padres Dam |
|
|
|
| 1992 |
June |
MPWMD- Ambessaw Assegued |
MPWMD |
The Carmel River Riparian Corridor Mgt. Plan - Vegetation Survey Mapping Plan |
|
Carmel River |
Riparian |
|
|
| 1992 |
June |
|
MPWMD |
Riparian Habitat Mitigation Plan for the Monterey Peninsula |
|
Monterey Peninsula |
Riparian |
|
|
| 1992 |
June |
|
Bechtel Corporation |
MPWSP New Los Padres Dam Geotechnical Studies |
|
Los Padres Dam |
|
|
|
| 1992 |
June |
|
MPWMD |
MPWMD Calculated Average Consumptions: Comercial Uses |
|
|
|
|
|
| 1992 |
June |
|
Philip Williams & Assoc Ltd |
Carmel River Lagoon Enhancement Plan |
|
Carmel River Lagoon |
|
|
|
| 1992 |
July |
Montgomery, James M. |
James M. Montgomery Consulting Engineers |
Refinement of Preliminary Design for 7 MGD Desalination Facility at Sand City Site |
|
Sand City |
Desalination |
|
|
| 1992 |
July |
|
CH2MHill |
Monterey Peninsula Reclaimed Water Urban Reuse Project Feasibility Report |
|
Monterey Peninsula |
|
|
|
| 1992 |
July |
|
Archaeological Consulting |
Cultural Resources Reconnaissance of the New Los Padres Dam and Reservoir Project Carmel Valley Monterey County CA |
updated (see June 1992) |
Los Padres Dam |
Cultural Resources |
|
|
| 1992 |
July |
|
EIP Associates |
MPWMD New Los Padres Dam Project - Valley Oak |
|
Los Padres Dam |
|
|
|
| 1992 |
August |
|
SWRCB |
Diversion and Use of Water From the Carmel River in Monterey County - Four Complaints Application 27614 and Petitions for Change and Extension of Time of Permit 7130B. Volume IV. Monday August 31 1992 |
|
Carmel River |
|
|
|
| 1992 |
September |
|
SWRCB |
Diversion and Use of Water from the Carmel River in Monterey County - Four Complaints Application 27614 and Petitions for Change and Extension of Time of Permit 7130B. Volume IV. Tuesday September 1 1992 |
|
Carmel River |
|
|
|
| 1992 |
September |
|
SWRCB |
Diversion and Use of Water from the Carmel River in |
|
Carmel River |
|
|
|
| 1992 |
September |
|
SWRCB |
Diversion and Use of Water from the Carmel River in |
|
Carmel River |
|
|
|
| 1992 |
September |
|
Staal Gardner & Dunne Inc |
Feasibility Study Saline Ground Water Intake/Disposal |
|
|
Groundwater |
|
|
| 1992 |
November |
|
ABA Consultants |
Effects of Hyper-saline Water on Survival of Olivella Pycna |
|
|
Water Quality |
Wildlife Habitat |
|
| 1992 |
December |
|
Voter Dist. Advisory Comm. |
Final Report and Recommendations of the Voter District Advisory Committe to the MPWMD |
|
|
|
|
|
| 1992 |
December |
|
Finance Advisory Comm. |
Recommendations of the Finance Advisory Committee to the MPWMD Board of Directors |
Final Report |
|
|
|
|
| 1992 |
December |
|
Paine Webber Incorporated |
Variable Rate Demand Certificates of Participation (Waste |
|
|
|
|
|
| 1992 |
December |
|
EIP Associates |
Near-Term Desalination Project |
Final EIR |
|
Desalination |
|
|
| 1992 |
December |
Breschini, Gary S. |
SOPA & Archaeological Consulting |
Phase II Archaeological Investigations for the New Los Padres Dam & Reservoir Project, Carmel Valley, Monterey CA |
Draft |
Los Padres Dam |
|
|
|
| 1993 |
January |
|
Brown & Wood |
Variable Rate Demand Certificates of Participation (Wastewater Reclamation Project) Series 1992 Volume I & II–1999 Letter of Credit Substitution |
|
|
|
|
|
| 1993 |
January |
Brown, C. and Laredo, D. |
De Lay & Laredo |
Findings for Certification of the Near-Term Desalination Project Final Environmental Impact Report |
|
|
Desalination |
|
|
| 1993 |
February |
|
U.S. Army Corps of Engin.Permit App. #16516S09 SCH #87092203 |
Supplemental Draft EIR/Statement II: Volume I II and Appendices |
Draft |
|
|
|
|
| 1993 |
February |
|
Graham Matthews & Asso. |
Evaluation of Impacts of the Monterey Peninsula Water Supply |
|
Monterey Peninsula |
Water Quantity |
|
|
| 1993 |
February |
|
Graham Matthews & Asso. |
Assessment of Channel-Forming Discharge for the Carmel |
|
|
|
|
|
| 1993 |
February |
|
EIP Associates |
The Carmel River Riparian Corridor Wildlife Habitat |
|
Carmel River |
Riparian |
|
|
| 1993 |
February |
|
US Army Corps of Engineers |
Comments & Responses on the August 1991 Supp. Draft |
|
|
|
|
|
| 1993 |
March |
|
MPWMD |
MPWMD Water Allocation Program Final Environmental |
|
|
|
|
|
| 1993 |
March |
Nottenkamper, Margo and Bell, Andrew M. |
MPWMD |
MPWMD Near-Term Desalination Project Engineer's Report |
|
|
Desalination |
|
|
| 1993 |
April |
|
MPWMD |
MPWMD Ten Year Review Carmel River Management |
|
Carmal River |
|
|
|
| 1993 |
April |
|
MPWMD |
MPWSP EIR/EIS 404 (B) (1) Compliance |
Rev. Draft |
|
|
|
|
| 1993 |
April |
Breschini, Gary S., and Haversat, Trudy |
SOPA & Archaeological Consulting |
Phase II Cultural Resources Investigations for the New Los Padres Dam & Reservoir Project Carmel Valley Monterey County CA |
|
Los Padres Dam |
|
|
|
| 1993 |
April |
|
MPWMD |
Resolution No. 93-05, A Resolution of the Board of Directors of the MPWMD Expressing Support for the Establishment of Resident Voter Divisions for District Elections |
|
|
|
|
|
| 1993 |
April |
Lapkoff, S. |
|
Documentation for Request for Preclearance of Change to |
|
|
|
|
|
| 1993 |
May |
|
MPWMD |
Formation of Resident Voter Divisions (Audio & Video tapes copy of report to Justice Dept.) stored in ASD file room #1 in safe-room. |
|
|
|
|
|
| 1993 |
May |
|
Technical Advis. Comm. |
Allocation of Water from the Seawater Desalination Project |
|
|
Desalination |
|
|
| 1993 |
May |
Litwin, Yoram J. |
|
Tech-Memo Adaption of CVCALB - Main Frame Version to Personal Computers (486DX/25) |
|
|
|
|
|
| 1993 |
June |
|
MPWMD |
Findings for Certification of the Water Allocation Program |
|
|
|
|
|
| 1993 |
June |
|
MPWMD |
Resolution No. 93-11 A Resolution of the MPWMD Adopting Findings for Increasing the Cal-Am Production Limit and Certifying the Supporting CEQA Documentation |
|
|
|
|
|
| 1993 |
June |
|
MPWMD |
Resolution No. 93-12 A Resolution of the MPWMD Certifying and Adopting Findings for the Water Allocation Program Final Environmental Impact Report and Selecting a Water Distribution Formula for Paralta Well |
|
|
|
|
|
| 1993 |
June |
|
Brown & Caldwell |
Draft, Cañada Reservoir Project Phase 3-Analysis of 15,000 Acre-Foot Reservoir |
|
|
|
|
|
| 1993 |
July |
|
MPWMD |
MPWMD Interim Environmental Relief Agreement, 1992-93 Annual Report |
|
|
|
|
|
| 1993 |
September |
Hanna, B., and Dettman, D. |
MPWMD |
Steelhead Smolt Mortality Experiment at Los Padres Dam Technical Memorandum 93-01 |
|
Los Padres Dam |
Wildlife Habitat |
Steelhead |
|
| 1993 |
September |
|
WESCO |
Assessment of Wetland and Riparian Communities Bordering |
|
Fort Ord |
Riparian |
|
|
| 1993 |
October |
|
MPWMD |
404 Permit Application #20364S09 (cross reference to #16516S09) (Application for Department of the Army Permit) |
|
|
|
|
|
| 1993 |
December |
|
US Army Corps of Engineers |
Public Notice for the New Los Padres Dam Project #20364S09 |
|
Los Padres Dam |
|
|
|
| 1993 |
November |
|
EIP Associates |
Valley Oak Woodland Mitigation & Monitoring Plan for the New Los Padres Water Supply Project |
|
Los Padres Dam |
Water Quantity |
|
|
| 1993 |
November |
|
Prunuske Chatham Inc |
Construction Staging Area Mitigation & Monitoring Plan for the New Los Padres Water Supply Project |
|
Los Padres Dam |
Water Quantity |
|
|
| 1993 |
November |
Dettman, David |
MPWMD |
Technical Memorandum 93-03 - Recommended Minimum Streamflow Requirements for the Reach Between the Proposed New Los Padres Reservoir and Existing San Clemente Reservoir |
|
Los Padres Dam |
|
|
|
| 1993 |
December |
|
D.W. Alley & Associates |
Assessment of the Potential Impacts of the Proposed New Los Padres Dam Project on the Steelhead Sport Fishery of the Carmel River |
|
Los Padres Dam |
Wildlife Habitat |
Steelhead |
|
| 1994 |
January |
Fuerst, D. |
MPWMD |
Technical Memorandum 94-01 - Comparison of Simulated Daily Flows under Unimpaired No Project and 24000 AF |
|
|
|
|
|
| 1994 |
February |
Chaffey, Mark |
|
Fish Migration Monitor Installation and Operating Instructions |
|
|
Wildlife Habitat |
|
|
| 1994 |
February |
|
Fort Ord Reuse Group |
Summary of Base Reuse Plan |
Preliminary Draft |
Fort Ord |
|
|
|
| 1994 |
March |
|
Assegued & Associates |
Riparian Habitat Mitigation Plan for the New Los Padres Project Carmel River Monterey County CA |
|
Los Padres Dam |
Riparian |
|
|
| 1994 |
March |
|
D.W. Alley & Associates |
IFIM Study (Development of Weighted Usable Area Curves) |
|
|
|
|
|
| 1994 |
March |
|
Fishery Working Group |
Recommended Instream Flow Requirements for the Carmel |
|
|
|
|
|
| 1994 |
March |
|
Citizen's Financial Committee |
Connection Charge Computation New Los Padres Dam |
|
Los Padres Dam |
|
|
|
| 1994 |
March |
|
US Army Corps of Engineers |
EIR/EIS Volume I New Los Padres Dam Project |
Final |
Los Padres Dam |
|
|
|
| 1994 |
March |
|
US Army Corps of Engineers |
EIR/EIS Volume II NLPDP Mitigation & Monitoring Program Plan |
Final |
|
|
|
|
| 1994 |
March |
|
US Army Corps of Engineers |
Final EIR/EIS Volume III NLPDP Technical Appendices |
Final |
|
|
|
|
| 1994 |
March |
|
US Army Corps of Engineers |
EIR/EIS Volume IV NLPDP Responses to Comments on SD EIR/EIS-II |
Final |
|
|
|
|
| 1994 |
April |
Lindberg, Thomas |
MPWMD |
Technical Memorandum 94-03 Changes in the Calculation of |
|
|
|
|
|
| 1994 |
May |
|
MPWMD |
1993 Annual Report - 5-Year Mitigation Program |
|
|
|
|
|
| 1994 |
May |
Lauster, |