Bibliography
Year_Publication Month_Publication Author Organization Description/Summary Status Geography Topic Topic2 Archive_Storage
1976
---------------
Cal-Am’s Proposed Canada De La Segunda Pipeline & Begonia Iron Removal Plant Project EIR Draft Canada De La Segunda

Y
1977
Boudreau, Hal
Lessons Learned from Mandatory Water Rationing on the Monterey Peninsula 1977
Monterey Peninsula Water Quantity
Y
1978

CH2MHILL Carmel Valley Vegetation Study
Carmel Valley Riparian
Y
1978 August Clayton, Carlton J.
Review of Studies & Reports for Supplemental Water Supply for Zone 11 (MCFC&WCD)
Zone 11 Water Quantity
Y
1979 March Buel, Bruce MPWMD Final Report to the California Coastal Commission Final


Y



USGS Los Padres Sedimentation Study
Los Padres Dam Sedimentation

1979 November Cortright, Clifford J.
Technical Feasibility Study (Carmel River Dam Sites)
Carmel River Dam

Y
1979 November Lewis, Robert C.
Proposed Dams on the Carmel River in Monterey County (Steelhead Release Reconnaissance)

Wildlife Habitat Steelhead Y
1980
***
Possible Off-Stream Storage Sites Map



Y
1980 January
MPWMD/CAL-AM Position Paper Re: Cal-Am Subcommittee Rate Application Draft


Y
1980 February Logan, John
Reconnaissance Study of Off-Channel Reservoirs Carmel River Basin
Carmel River

Y
1980 April Williams, John G. MPWMD Stream Flow & Reservoir Yield at the San Clemente Site Carmel River
San Clemente Dam Water Quantity
Y
1980 July Cortright, Clifford J.
New San Clemente Dam & Reservoir Cost Estimates
San Clemente Dam

Y
1980 July Fritts, Harold C. and Gordon, Geoffrey A.
Annual Precipitation for California Since 1600, Reconstructed From Western North American Tree Rings

Water Quantity
Y
1980 August Cortright, Clifford J.
Chupines Creek Dam & Reservoir Reconnaissance Level Cost Estimate
Chupines Creek Dam

Y
1980 October Woodhouse, Robert
Physiological Ecology Reconnaissance Study

Wildlife Habitat
Y
1980 October
Recht Hausrath & Associates Economic & Demand Projections



Y
1980 October
Recht Hausrath & Associates Financing Mechanisms & Revenue Sources



Y
1980 October Walsh, Kevin MPWMD Review of Seaside Ponding Project
Seaside

Y
1980 October Lewis, Robert C.
Flow Requirements in the Carmel River With the Proposed New San Clemente Dam
San Clemente Dam Water Quantity
Y
1980 November
U.C. Berkeley Residential and Institutional Rainwater Collection Systems

Water Quantity
Y
1981 February
SERL Rainwater Collection System

Water Quantity
Y
1981 May Buel, Bruce MPWMD Standby Rationing Plan

Water Quantity
Y
1981 May
US Army Corps of Engineers Feasibility Report on Water Resources Development Carmel River
Carmel River Groundwater
Y (located on General Manager's bookshelf)
1981 July Ward, Davis, and Dixon Converse Consultants Economic Feasibility Analysis & Comprehensive Water Supply Program

Water Quantity
Y
1981 July Logan, John
Reconnaissance of Alternatives for Recharging Seaside Aquifer
Seaside Water Quantity
Y
1981 July Curry, Robert and Kondolf, G. Mathias
Carmel River Sediment Study
Cramel River Sediment Transport
Y
1981 August Schmidt, Kenneth D.
Ryan Ranch Water Supply
Ryan Ranch Water Quantity
Y
1981 September
D.W. Kelley & Associates Reconnaissance of Water Development for the Carmel River
Carmel River

Y
1981 September Curry, Robert R. and Kondolf, G. Mathias
The Role Riparian Vegetation in Channel Bank Stability: Carmel River CA
Carmel River Riparian
Y
1981 September Hecht, Berry
Sequential Changes in Bed Habitat Conditions in the Upper Carmel River Following the Marble-Cone Fire of August 1977
Upper Carmel River Wildlife Habitat
Y
1981 October Beattie, Joan and Murphy, Patti USC Vegetation of the Carmel River Valley
Carmel River Riparian
Y
1981 November Buel, Bruce MPWMD Investigation into Los Padres Reservoir Silt Release Final Los Padres Dam

Y
1981 November Hydro Data Inc. Hydro Data Inc. Evaluation of Bank Erosion Near Manor Well
Manor Well Erosion
Y
1981 November Dettman, D.H. D.H. Dettman D.W. Kelley & Associates Reconnaissance Report: Streambed Sedimentation and Steelhead Habit in the Carmel River Below Los Padres With Some Possible Solutions to the Problem
Los Padres Dam Wildlife Habitat Steelhead Y
1981 November Logan, John
Fort Ord (Seaside) Monitor Wells
Fort Ord Groundwater
Y
1981 December Curry, Robert W.
Sediment Transport Analysis Between Los Padres and San Clemente Reservoirs
Los Padres Dam Sediment Transport
Y
1982 January Logan, John WWD Corporation Seaside Recharge Predesign Study Coastal Barrier Experiment
Seaside Groundwater
Y
1982 February
James M. Montgomery Consulting Engineers Carmel Valley Wastewater Study
Carmel Valley Wastewater
Y
1982 March Logan, John
The Estimated "Excess" Capacity of Canada Pipeline



Y
1982 March Buel, Bruce MPWMDv Carmel River Management Program
Carmel River Management
Y
1982 March Logan, John WWD Corporation Seaside Recharge Predesign Study Injection Trials at Plumas 2
Seaside Groundwater
Y
1982 March
D.W. Kelley & Associates The Probable Effect of Carmel River Water Supply Alternatives on Steelhead Resources
Carmel River Water Quantity Steelhead Y
1982 May
MPWMD Model Ordinance



Y
1982 June Logan, John
Hydrogeology of the Seaside Area
Seaside

Y
1982 June Logan, John
Recharge of the Carmel Valley Aquifer: A Preliminary Assessment
Carmel Valley Groundwater
Y
1982 June
MPWMD MPWMD Water Supply Project - Initial Study and Scope of Work

Water Quantity
Y
1982 June Logan, John
Percolation at Ryan Ranch
Ryan Ranch

Y
1982 July
USGS Letter Report on Old Carmel Rating Curve



Y
1982 July Krebs, Frances Krebs and McClain Operations Model Documentation for On-Channel and Off-Channel Reservoirs



Y
1982 August
Recht Hausrath & Associates Economic & Demographic Forecasts Draft Report


Y
1982 August
Converse Consultants New San Clemente Project Preliminary Design & Feasibility Study
San Clemente Dam

Y
1982 September
WWD Corporation Pressurized Recharge at the Plumas Site Seaside
Seaside Groundwater
Y
1982 September Muir, K.S. USGS Groundwater in the Seaside Area Monterey Co. CA (USGS Water Resources Investigations 82-10)
Seaside Groundwater
Y
1982 October
Converse Consultants New San Clemente Project Conceptual Design & Cost Estimate of Fish Attraction Facilities
San Clemente Dam

Y
1982 November Kondolf, G. Mathias and Curry, Robert
Seepage Investigations Carmel River 1982 Water Year
Carmel River

Y
1982 November Buel, Bruce MPWMD Comparison of Water Supply Alternatives

Water Quantity
Y
1982 December
Converse Consultants New San Clemente Project Conceptual Design and Cost Allowance of Diversion Alternatives
San Clemente Dam

Y
1982 December Cortright, Clifford J.
Arroyo Seco Dam Sites
Arroyo Seco Dam

Y
1982 December Buel, Bruce MPWMD Applications Relating to the MPWMD Water Supply and Management Project

Water Quantity
Y
1982 December
Recht Hausrath & Associates Economic and Demographic Projections Draft


Y
1982
Kondolf, G. Mathias
Recent Channel Instability and Historic Channel Changes of the Carmel River, Monterey Co. CA. (MS Thesis U.C. Santa Cruz)
Carmel River

Y
1983 January G.W. Kapple, G.W., Johnson, M.J., and Van Schoten, D.A. USGS Digital Flow Model of the Carmel Valley Alluvial Ground Water Basin (draft)
Carmel Valley Groundwater
Y
1983 January Woodhouse, Robert
Baseline Analysis of the Riparian Vegetation in the Lower Carmel Valley
Lower Carmel Valley Carmel Valley Riparian Y
1983 January Williams, John G. MPWMD Carmel River Watershed Management Plan Working Paper No. 1: Habitat Change in the Carmel River Basin
Carmel River Wildlife Habitat
Y
1983 January
Recht Hausrath & Associates Economic & Demographic Projections



Y
1983 February
USGS Sediment Data Collected in Carmel Valley
Carmel Valley Sediment Transport
Y
1983 March Buel, Bruce, and Anderson, R. K. MPWMD Engineer's Report, Carmel River Management Zone (MPWMD Zone #3)
Carmel Valley

Y
1983 March
Federal Emergency Management Agency Flood Insurance Study Preliminary
Flooding
Y
Undated

San Diego Water Utilities Department Municipal Sewage Treated to Potability Using Aquaculture Through Membranes

Sewage Aquaculture Y
1983 April Williams, John G. MPWMD Carmel River Watershed Management Plan Working Paper No. 2: Water Supply Options for the Monterey Peninsula
Monterey Peninsula Water Quantity Management Y
1983 April
LAFCO MPWMD Sphere of Influence



Y
1983 April Logan, John
The Carmel Valley Alluvial Aquifer: Bedrock Geometry Hydraulic Parameters and Storage Capacity Final Carmel Valley Groundwater
Y
1983 May
Recht Hausrath & Associates Economic & Demographic Forecasts Draft Report


Y
1983 June
D.W. Kelley & Associates Assessment of Carmel Steelhead Resource: Its Relationship to Streamflow and to Water Supply Alternatives Draft
Water Quantity Steelhead Y
1983 June
MPWMD Scope of Work, Water Supply Project Environmental Impact Report Revised Draft
Water Quantity
Y
1983 June Williams, John and Kondolf, G. Mathias
Channel Stability & Fish Habitat Carmel River CA Symposium & Field Conference Guidebook
Carmel River Channel Stability Wildlife Habitat Y
1983 June Krebs, Frances
Computation of Total Sediment Load of the Carmel River, CA
Carmel River Sediment Transport
Y
1983 June Snider, William Calif. Dept. of Fish and Game Reconnaissance of the Steelhead Resource of the Carmel River Drainage
Carmel River Steelhead
Y
1983 June
Converse Consultants New San Clemente Project Conceptual Design & Cost Estimate of a Rollcrete Dam Alternate Draft San Clemente Dam

Y
1983 July Logan, John
Storage Calculations Carmel Valley Alluvial Aquifer
Carmel Valley Groundwater
Y
1983 August Williams, John G. MPWMD Habitat Protection in the Carmel River Basin: Legal Issues CRWMP Working Paper No. 3
Carmel River Wildlife Habitat
Y
1983 August Williams, Molly
Avifauna of the Carmel River Riparian Corridor, CRWMP, Working Paper No. 4
Carmel River Riparian
Y
1983 August
MPWMD Carmel River Management Zone Assessment List
Carmel River

Y
1983 September Buel, Bruce MPWMD Letter to Riverfront Property Owners re Permit Process



Y
1983 September Williams, John G. MPWMD Legal Status of Carmel Valley Groundwater, CRWMP, Working Paper No. 6
Carmel Valley Groundwater
Y
1983 October Williams, Molly
Riparian Mammals and Herptofauna of Carmel Valley, CRWMP, Working Paper No. 4 1/2
Carmel Valley Riparian Wildlife Habitat Y
undated
Mount, Russ
Pumping Tests of Four Wells in Lower Carmel Valley, CA for California-American Water Company (Draft)
Lower Carmel Valley Groundwater
Y
1983 October
Graham Matthews & Asso. Discharge & Sediment Load for Tributaries to the Carmel River, CRWMP, Working Paper No. 5
Carmel River Tributaries Sediment Transport
Y
1983 October
Graham Matthews & Asso. A Summary of the Report Entitled: Discharge & Sediment Load for Tributaries to the Carmel River, CRWMP, Working Paper No. 5
Carmel River Sediment Transport
Y
Various
Adjarian, Fred
Misc. Documents Relating to EIR



Y
1983 October
Converse Consultants New San Clemente Project Evaluation of Hydroelectric Power
San Clemente Dam

Y
Various
Adjarian, Fred
EIR Segments



Y
1983 October Wagner, Charles H.
Study of Upstream and Downstream Migrant Steelhead Passage Facilities for the Los Padres Project and New San Clemente Project
Los Padres Dam Steelhead
Y
1983 December Curry, R.
Sediment Transport and Channel Stability Carmel Draft
Sediment Transport Channel Stability Y
1983 December
Herman Kimmel & Associates Traffic Engineering Analysis San Clemente Dam Project
San Clemente Dam

Y
1983 December
CAL-AM Water Company Carmel Valley Well Scheduling Program
Carmel River Groundwater
Y
1983 December
WESTEC Services Inc. Cultural Resources Survey San Clemente Dam Enlargement Upper Carmel Valley
San Clemente Dam

Y
1983 December Logan, John
A Review of 1982 Pumping Tests of the Pearce Cypress San Carlos and Rancho San Carlos Wells Carmel Valley
Carmal Valley Groundwater
Y
1984 January
WESTEC Services Inc. Noise Assessment San Clemente Dam Enlargement Upper Carmel Valley
San Clemente Dam

Y
1984 January Heuer, Dick MPWMD Re-Examination of Supply and Demand in the Monterey Peninsula Water Management District Draft Monterey Peninsula Water Quantity
Y
1984 March Williams, John G. MPWMD Carmel River Watershed Management Plan Draft Carmel River Management
Y
1984 March Curry, Robert
Observations on Quaternary and Recent Fault Activity, Central Coastal California



Y
1984 April Benoit, John MPWMD Water Conservation Plan for Monterey County Final Draft Monterey County Water Quantity
Y
1984 April Page, Gary L. and Matthews, Graham MPWMD Carmel River Management Plan Final Carmel River Management
Y
1984 April
MPWMD Water Conservation Plan, Executive Summary

Water Quantity
Y
1984 April
DMA Consulting Engineers Phase I Report Irrigation System Design Lower Carmel
Lower Carmel Valley

Y
1984 April
MPWMD 1984 Drought Report

Water Quantity
Y
1984 May
Converse Consultants New San Clemente Project Fish Passage Facilities
San Clemente Dam Wildlife Habitat
Y
1984 May Page, Gary L. MPWMD Engineer's Report, Boronda Erosion Control Project (MPWMD Zone No. 4)

Erosion
Y
1984 May
DMA Consulting Engineers Preliminary Design & Cost Estimate Boronda Project Irrigation System Carmel River Management Program
Carmel River Water Quantity Management Y
1984 May
Converse Consultants New San Clemente Project Geotechnical Studies for the EIR
San Clemente Dam

Y
1984 May
Wulff Hansen & Co. Boronda Erosion Control Project Zone (Zone No. 4), Underwriting

Erosion
Y
1984 June King, Richard W.
Assessing the Use of Direct Recycle of Wastewater for Potable Water Supply in the Monterey Peninsula
Monterey Peninsula Water Quantity Wastewater Y
1984 June Maloney, Linda
Aquifer-Stream Interaction in the Lower Carmel Valley, July 1983-January 1984
Lower Carmel Valley

Y
1984 June
Recht Hausrath & Associates Growth Impacts: Housing & Employment Forecasts With and Without the Proposed Project Draft


Y
1984 June
Recht Hausrath & Associates Socioeconomic Impacts of the Proposed San Clemente Dam Working Paper No. 1. Growth Impacts: Housing & Employment Forecasts With and Without the Proposed Project
San Clemente Dam

Y
1984 June
MPWMD MPWMD Responsibilities and Expenditure History



Y
1984 June Kapple et al. USGS Analysis of the Carmel Valley Alluvial Ground Water Basin Monterey Co. CA (USGS Water-Resources Investigations Report 83-4280)

Groundwater
Y
1984 July
Rauscher Pierce Refnes Inc Work Product No. 1 Pertaining to Financial Analysis of the San Clemente Dam Project
San Clemente Dam

Y
1984 July
Converse Consultants New San Clemente Project Preappraisal Engineering Studies
San Clemente Dam

Y
1984 July
MPWMD Contract Documents for the Drilling of Three Observation Wells and Fourteen Neutron Probe Access Tubes in Carmel Valley
Carmel Valley Groundwater
Y
1984 July Page, Gary L. MPWMD Analysis of Specific Works, Carmel Valley Trail & Saddle Club



Y
1984 July
Prepared for the City of San Diego by the Health Advisory Committee Proposed Workplan for the Evaluation of Potential Health Risk Associated with the San Diego Total Recovery Program
San Deigo

Y
1984 July Logan, John
Increased Ground Water Production in the Seaside Area Draft Seaside Groundwater
Y
1984 July
Rogers E. Johnson & Assoc New San Clemente Dam Geotechnical Investigation: Location
San Clemente Dam

Y
1984 August
ESA Carmel River Management Plan & Boronda Erosion Project EIR
Carmel River Erosion Management Y
1984 August
D.W. Kelley & Associates Evaluation of Alternative Upstream Fish Passage Facilities Over San Clemente
San Clemente Dam Wildlife Habitat
Y
1984 August
D.W. Kelley & Associates Appendices to: Assessment of the Carmel River Steelhead Resource; Its Relationship to Streamflow; and to Water Supply Alternatives
Carmel River Water Quantity Steelhead Y
1984 August Buel, Bruce MPWMD Network Analysis San Clemente Dam
San Clemente Dam

Y
1984 August
Engineering Science Inc. Pebble Beach Community Services District Wastewater Treatment and Disposal Project Draft EIR Pebble Beach Wastewater
Y
1984 September Woodhouse, R.M.
Water Potential and Vegetation Survey of the Lower Carmel River
Lower Carmel River Water Quantity Riparian Y
1984 October
MPWMD Willow Planting Guidelines



Y
1984 October
MPWMD Response to Comments on Carmel River Management Plan and Boronda Erosion Control Project Draft EIR
Carmel River Erosion Management Y
1984 November
MPWMD-Financial Advisory Committee Recommendation for the Financing of San Clemente Final San Clemente Dam

Y
1984 November Matthews, Graham MPWMD Carmel River Research Program, 1984 Draft Carmel River

Y
1984 December Stern, Henrietta MPWMD Initial Study, Ord Village Reclamation Pilot Plant
Fort Ord

Y
1984 December Byrnes, John MPWMD Field Report Discharges of the Carmel River and Carmel Valley Water Table Levels
Carmel River Groundwater
Y
1984 December
Creegan & D'Angelo Aquaculture Reclamation Program Ord Village Pilot Plant
Fort Ord Aquaculture
Y
1984 December McGlochlin, Linda
Aquifer-Stream Interaction in the Lower Carmel Valley
Lower Carmel Valley

Y
1985 January
MCFC & WCD Flood Fighting and Erosion Control Manual

Erosion Flooding Y
1985 January
DMA Consulting Engineers Phase 3 Report, Irrigation System Riparian Corridor, Lower Carmel Valley
Lower Carmel Valley Riparian
Y
1985 January
Converse Consultants New San Clemente Project; Joint Use Facilities Progress Report
San Clemente Dam

Y
1985 January
Rogers E. Johnson & Assoc New San Clemente Dam, Geotechnical Investigation of Faulting in the Knothole Area
San Clemente Dam

Y
1985 February Krebs, Frances
An Analysis of the Sediment Discharged into the Carmel Bay from the Carmel River and the Carmel Sanitary District Outfall
Carmel Bay Sediment Transport
Y
1985 March Buel, Bruce MPWMD Summary, San Clemente Dam Project
San Clemente Dam

Y
1985 March
MPWMD Guidelines for Performance Appraisal



Y
1985 March
Recht Hausrath & Associates Hotel Employee Projections as a Component of June 1984 Job Projections



Y
1985 April Ricker, Michael MPWMD How are New Water Connection Fees Computed?



Y
1985 April
Recht Hausrath & Associates Working Paper No. 3, Socioeconomic Impacts of Proposed San Clemente Dam Draft San Clemente Dam

Y
1985 April
Recht Hausrath & Associates Hotel Employee Projection & as Component of June 1984 Job Projections Under All Three Scenarios



Y
1985 April
Graham Matthews & Asso. Portable Irrigation System Testing Report



Y
1985 April
Rogers E. Johnson & Assoc Investigation of Possible Fault Offsets in Stream Terraces Along the Carmel River at Sleepy Hollow
Sleepy Hollow

Y
1985 April Matthews, Graham MPWMD Summary of Boronda Erosion Control Project

Erosion
Y
1985 May
Geomatrix Evaluation of Seismic Design Criteria New San Clemente Dam
San Clemente Dam

Y
1985 May Buel, Bruce MPWMD CAL-AM Allocation Summary



Y
1985 May Buel, Bruce MPWMD 1985-86 Water Supply Strategy

Water Quantity
Y
1985 May Stern, Henrietta MPWMD EIR Ord Village Reclamation Plant Draft Fort Ord

Y
1985 May
Converse Consultants Ground Water Evaluation of the Seaside Aquifer Phase I Final Report Seaside Groundwater
Y
1985 May
Converse Consultants Ground Water Evaluation of Seaside Aquifer System Addendum to Phase I Final Report Seaside Groundwater
Y
1985 May
Converse Consultants New San Clemente Project; Consultants Joint Use Studies Draft San Clemente Dam

Y
1985 June
MPWMD Carmel River Management Program Newsletter – Summer 1985
Carmel River

Y
1985 June Stern, Henrietta MPWMD Project Summary, Ord Village Pilot Reclamation Plant
Fort Ord

Y
1985 June Anderson, Nichols
Hydrology Study for Point Lobos Ranch (with Addendum of June 1985) Final Point Lobos Ranch

Y
1985 June
California Public Utilities Commission General Report on the Results of Cal-Am Water Company for Test Years 1986 and 1987 in Connection With: (four Division application numbers)



Y
1985 June
California Public Utilities Commission Report on the Operations of Cal-Am Water Co. in the Monterey Peninsula District for Test Years 1986 and 1987
Monterey Peninsula

Y
1985 July Litwin, Yoram and Davis, John
Review of the MPWMD Daily Simulation Model



Y
1985 July Matthews, Graham MPWMD MPWMD Irrigation Program: Review of Its Development



Y
1985 July Laredo, David
Irrigation License and River Corridor Access Permission



Y
1985 July
California Public Utilities Commission Report on the Cost of Capital and Rate of Return for Cal-Am Water Company Division Rate of Return Section



Y
1985 July Dreiss, Shirley J. and Reid, Mark U.C. Santa Cruz Data Analysis and Numerical Model Development for the Carmel Valley Aquifer
Carmel Valley Groundwater
Y
1985 July Anderson, Nichols
Monterra Ranch Water Supply Study
Monterra Ranch Water Quantity
Y
1985 July
DMA Consulting Engineers Phase 3 Report Irrigation System, Riparian Corridor, Lower Carmel Valley
Lower Carmel Valley Riparian
Y
1985 July Woodhouse, Robert M.
Analysis of the Phase 3 Report on 1984 Lower Carmel Production Well Pumping Data
Lower Carmel Valley Groundwater
Y
1985 July Stern, Henrietta MPWMD Final EIR Ord Village Working Draft Fort Ord

Y
1985 July Recht, Richard Recht Hausrath & Associates The Effect of Revised Connection Fees & Water User Charges on Development



Y
1985 August Oliver, Joseph MPWMD Independent Review of Pumping Test Documentation in DMA Phase 3 Report



Y
1985 August Clark, Joseph C. and McKittrick, Mary A.
Reconnaissance Field Study of the Relationship Between Tularcitos & Navy Fault Zones
Tularcitos & Navy Fault Zones

Y
1985 August Woodhouse, R.M.
Analysis of the Phase 3 Report on 1984 Lower Carmel Production Well Pumping Data
Lower Carmel Valley Groundwater
Y
1985 August
Converse Consultants New San Clemente Project; Joint Use Studies Final San Clemente Dam

Y
1985 September
Creegan & D'Angelo Feasibility Analysis of Wastewater Reclamation for Groundwater Recharge

Groundwater
Y
1985 September Anderson, Nichols
Water Supply Study for Laguna Seca Ranch
Laguna Seca Water Quantity
Y
1985 September Stern, Henrietta MPWMD Final EIR, Ord Village Pilot Reclamation Plant (plus David Shonman's Butterfly Report) Final Fort Ord Wildlife Habitat
Y
1985 October
MPWMD Water Conservation Plan for Monterey County Draft Monterey County Water Quantity
Y
1985 October
MPWMD 1985-86 District Goals & Objectives



Y
1985 October Oliver, Joseph MPWMD MPWMD Research Program for 1985-86



Y
1985 October Litwin, Yoram
Phase II Review of the MPWMD Daily Simulation Model of



Y
1985 November
MPWMD Summary of MPWMD Allocations Adopted April 1981



Y
1985 November
MPWMD Fisheries Restoration Act of 1985, Proposal Number One

Wildlife Habitat
Y
1985 November
Luhdorff & Scalmanini Feasibility Study of Developing a Water Supply tularcitos Formation Carmel Valley Ranch Draft Carmel Valley Ranch Water Quantity
Y
1985 November
Luhdorff & Scalmanini Feasibility Study of Developing a Water Supply Tularcitos Formation Carmel Valley Ranch Final Carmel Valley Ranch Water Quantity
Y
1985 December
Aqua Terra Laguna Seca Ranch Water Supply Proposal Laguna Seca Water Quantity
Y (Missing from file when Archived)
1985 December
DMA Consulting Engineers Drawdown Simulation Lower Carmel Valley
Lower Carmel Valley

Y (Missing from file when Archived)
1986 January Ricker, Michael MPWMD Water Conservation Plan for Monterey County (see August 1987 for revised version) Final Monterey County Water Quantity Management
1986 January
MPWMD Carmel River Management Program Schulte Restoration Project
Carmel River
Management
1986 January
Rogers E. Johnson & Assoc Preliminary Report of Landsliding in the Vicinity of the Proposed New San Clemente Reservoir
San Clemente Dam


1986 February Dryden, Frank
Evaluation of Alternative Water Reuse Projectsor the Monterey Peninsula Draft Monterey Peninsula


1986 February
US Army Corps of Engineers Long-Range Water Supply Development for FoOrd California
Fort Ord Water Quantity

1986 February
EIP Associates New San Clemente Dam EIR Draft San Clemente Dam


1986 February Matthews, W.G.V. and Kondolf, G. Mathias
Transport of Tracer Gravels on a Coastal California River (Journal of Hydrology 85 pp.265-280)




1986 March Dryden, Frank
Evaluation of Alternative Water Reuse Projects for the Monterey Peninsula Final Monterey Peninsula


1986 April McNiesh, Charles M.
Effects of Production Well Pumping on Plant Water Stress in the Riparian Corridor of the Lower Carmel Valley; Volumes 1 2 and 3 Draft Lower Carmel Valley Riparian Groundwater
1986 April Oliver, Joseph MPWMD Technical Memorandum 86-02 - Procedure Outline for Draft



1986 April Oliver, Joseph and Litwin, Yoram MPWMD Technical Memorandum 86-03 - Compilation of Ground Water Data for Calibration of the Carmel Valley Simulation Modelf
Carmel Valley Groundwater

1986 April Oliver, Joseph MPWMD Technical Memorandum 86-01, Carmel Valley Ground Water Storage Calculation Draft Carmel Valley Groundwater

1986 May
MPWMD MPWMD Projections Draft



1986 May Buel, Bruce MPWMD 1986-87 Water Supply Strategy

Water Quantity

1986 May
Sutro & Co. Inc. San Clemente Water Revenue Bonds Finance Report
San Clemente Dam


1986 June
D.W. Kelley & Associates Report on Field Reconnaissance and Review of Downstream Fish Passage Facilities at Reservoirs on the Santiam and North Fork Clackamas Rivers in Oregon
Santiam and North Fork Clackamas Rivers, Oregon Wildlife Habitat

1986 June
Converse Consultants New San Clemente Project Preliminary Design and Cost Estimate Draft San Clemente Dam


1986 June Stern, Henrietta MPWMD Application for 404 Permit and Draft Notice of Intent




1986 July
D.W. Kelley & Associates Relationships Between Steelhead Sport Catch Angling Success and Stream Flow

Wildlife Habitat Steelhead
1986 July Oliver, Joseph MPWMD Draft Technical Memorandum 86-04 Estimation of Ground-Water Outflow From Aquifer Sub-Units Carmel Valley Simulation Model Draft Carmel Valley Groundwater

1986 July Fuerst and Greenwood MPWMD Technical Memorandum 86-05 Private Pumpage from the Carmel Valley and Seaside Aquifers Draft Seaside Groundwater

1986 July Fuerst and Greenwood MPWMD Technical Memorandum 86-05 Private Pumpage from the Carmel Valley and Seaside Aquifers Final Seaside Groundwater

1986 July Finnigan, James MPWMD Final Technical Memorandum 86-07 Sediment Carrying Capacity of the Carmel River at Via Mallorca Bridge
Via Mallorca Bridge Sediment Transport

1986 July Finnigan, James MPWMD Average Daily Temperatures at San Clemente Dam
San Clemente Dam


1986 July Finnigan, James MPWMD Staff's Response to New San Clemente Dam Project Preliminary Design and Cost Estimate, Converse Consultants, June 1986
San Clemente Dam


1986 July
EIP Associates Growth Impacts Study for the San Clemente Dam Public Workshop
San Clemente Dam Wildlife Habitat

1986 August Stern, Henrietta MPWMD Monterey County Fair Handouts
Monterey County


1986 August Stern, Henrietta MPWMD Evaluation of Water Supply Alternatives for the Monterey Peninsula
Monterey Peninsula Water Quantity

1986 August
Staal Gardner & Dunne Inc Phase I Hydrogeologic Assessment Laguna Seca Final Laguna Seca


1986 August
EIP Associates Growth Impacts Study for the San Clemente Dam Draft San Clemente Dam Wildlife Habitat

1986 August
Staal Gardner & Dunne Inc Phase I Hydrogeologic Assessment Laguna Seca Final Laguna Seca


1986 August
DeLay Laredo & McGowan NEPA Alternatives Analysis




1986 September
D.W. Kelley & Associates Assessment of the Carmel River Steelhead Resource - Volume
Carmel River Wildlife Habitat Steelhead
1986 September
Rogers E. Johnson & Assoc C14 Dates from Exploratory Trenches New San Clemente
San Clemente Dam


1986 September Oliver and Fuerst MPWMD Technical Memorandum 86-06- Pumping Capacity as a Draft
Groundwater

1986 October Williams, John MPWMD Photodocumentation of the Effects of Well Pumping on

Groundwater

1986 October Stern, Henrietta MPWMD Evaluation of Water Supply Alternatives for the Draft
Water Quantity

1986 November
EIP Associates Interim Growth Impacts Study for the San Clemente Dam
San Clemente Dam


1986 November
Converse Consultants New San Clemente Project Preliminary Design and Final San Clemente Dam


1986 November Stern, Henrietta MPWMD Technical Memorandum 86-08 Development of Water Demand

Water Quantity

1986 December Greenwood, Ken MPWMD Carmel River Watershed Management Plan Draft Carmel River


1987 January Greenwood, Ken MPWMD Appendices to Draft CRWMP




1987 January
Fort Ord Department of the Army License for Fort Ord Monitor Wells
Fort Ord


1987 January
Staal Gardner & Dunne Inc Fort Ord Ground Water Monitoring Well Project
Fort Ord Groundwater

1987 January Heuer, Dick MPWMD Statement to Mayors' Select Committee




1987 January Stern, Henrietta MPWMD Evaluation of Water Supply Alternatives for the Monterey Peninsula Final Monterey Peninsula Water Quantity

1987 February

MPWMD Law (West's Annotated California Water Water)




1987 April
D.W. Kelley & Associates Preservation of Carmel River Steelhead with Fish Passage Facilities over San Clemente Dam or with a Hatchery Near Its Base
San Clemente Dam Wildlife Habitat Steelhead
1987 April
Converse Consultants New San Clemente Project Preliminary Design and Cost Estimate  Fish Conveyance Facilities Draft San Clemente Dam


1987 April
Staal Gardner & Dunne Inc Hydrogeologic Assessment Monterey Sand Company, Metz Road Well Sand City California
Sand City


1987 May
Converse Consultants New San Clemente Project Preliminary Design and Cost Estimate; Fish Conveyance Facilities Final San Clemente Dam


1987 May
Converse Consultants New San Clemente Project Engineering Summaries of Additional EIR Alternatives
San Clemente Dam


1987 May
Converse Consultants New San Clemente Project Dam Break Study Report
San Clemente Dam


1987 May Stern, Henrietta MPWMD Supplementary Evaluation of Water Supply Alternatives For the Monterey Peninsula
Monterey Peninsula Water Quantity

1987 May
Archaeological Consulting Archaeological and Historical Investigations for the San




1987 May
MPWMD Hydrogeologic Investigation, Seaside Coastal Ground Water
Seaside Groundwater

1987 May Oliver, Joseph MPWMD Technical Memorandum 87-09, Summary of Seaside Coastal Ground Water Basin Evaluation
Seaside Groundwater

1987 June Stern, Henrietta MPWMD Technical Memorandum 87-15, Description of New San Clemente Project and "No Project" Conditions Draft San Clemente Dam


1987 June
D.W. Kelley & Associates Assessment of the Carmel River Steelhead Resource, Volume II, Evaluation of the Effects of Alternative Water Supply Projects on the Carmel River Steelhead Resource
Carmel River Water Quantity Steelhead
1987 June Oliver, Joseph MPWMD Technical Memorandum 87-10, Effects on the Upper Carmel Valley Aquifer from Additional Well Development
Upper Carmel Valley Groundwater

1987 June Roberson, D., and Roberson, R.
Carmel River Bird Survey
Carmel River Wildlife Habitat

1987 June Matthews, Graham MPWMD Technical Memorandum 87-13 Evaluation of the Effects of the Feasible New San Clemente Project Alternatives on the Channel Stability and Sediment Transport of the Carmel River Draft San Clemente Dam Sediment Transport

1987 July
EIP Associates New San Clemente Project Administrative Draft EIR/EIS San Clemente Dam


1987 July Buel, Bruce MPWMD Development of Distribution Concept Allotments for Allocation System EIR




1987 August Ricker, Michael MPWMD Water Conservation Plan for Monterey County (Current in Effect)
Monterey County Water Quantity

1987 August
D.W. Kelley & Associates Assessment of the Carmel River Steelhead Resource Supplement to Volume II Carmel River Wildlife Habitat Steelhead
1987 August Thorton, Edward B.
Impacts on Carmel River State Beach Due to the New San
Carmel River State Beach


1987 September Fuerst, D. and Litwin, Y. MPWMD Overview of Carmel Valley Simulation Model
Carmel Valley


1987 September
EIP Associates New San Clemente Project Draft EIR/EIS San Clemente Dam


1987 September
EIP Associates Appendices Draft EIR/EIS



1987 September
EIP Associates Summary, New San Clemente Project EIR/EIS
San Clemente Dam


1987 September Stern, Henrietta MPWMD New San Clemente Project, Summary of Facts
San Clemente Dam


1987 September Fuerst, D. W. MPWMD Attachment A, Determination of Water Supply Categories for the Monterey Peninsula Water Resources System
Monterey Peninsula Water Quantity

1987 September
Staal Gardner & Dunne Inc Hydrogeologic Investigation Phase II Point Lobos Ranch Water Supply Study Monterey Co. CA Draft Point Lobos Ranch Water Quantity

1987 October
Planning Analysis & Development Water Allocation Program Administrative Draft



1987 October
Staal Gardner & Dunne Inc Hydrogeologic Investigation Phase II Point Lobos Ranch
Point Lobos Ranch


1987 October
D.W. Kelley & Associates Assessment of The Carmel River Steelhead Resource, Volume II, Evaluation of the Effects of Alternative Water Supply Projects on the Carmel River Steelhead Resource Final Carmel River Water Quantity Steelhead
1987 October Oliver, Joseph MPWMD Technical Memorandum 87-17: Procedures Simulating Water Level Drawdowns in the Carmel Valley Aquifer Under Different Water Supply System Production Conditions Draft Carmel Valley Water Quantity Groundwater
1987 November Stern, Henrietta MPWMD Written and Oral Comments on New San Clemente Project Draft EIR/EIS
San Clemente Dam


1987 November
CESAND Permit System Users Manual




1987 November
CESAND Water Permit System Technical Documentation




1988 January
CAL-AM Water Company Report on the Results of Operations and Revenue Requirements




1988 February Stern, Henrietta MPWMD Proposed Concept for Selection of Practicable Alternatives, The New San Clemente Project Supplementary Draft EIR/EIS
San Clemente Dam


1988 March
Planning Analysis & Development Water Allocation Program EIR Draft



1988 March Stern, Henrietta MPWMD Summary of Agency Comments on Alternatives Proposal and District Responses




1988 March Buel, Bruce MPWMD Proposed Process for Screening of Monterey Peninsula Water Supply Alternatives
Monterey Peninsula Water Quantity

1988 March
MPWMD MPWMD Staff Recommendations Re: Alternatives for Draft



1988 April
EIP Associates Estimates of Housing and Employment at Buildout within the Monterey Peninsula Water Management District
Monterey Peninsula


1988 April Greenwood, Ken MPWMD Carmel River Watershed Management Plan Conceptual Draft Carmel River


1988 May
Calif. Department of Report to the California Water Commission. Department of




1988 May
J. Laurence Mintier & Assoc Water Supply and Water Distribution Options. Draft Allocation Program EIR Phase I Draft
Water Quantity

1988 May
MPWMD Evaluation of Water Supply Alternatives for the New San Clemente Project Supplemental Draft Environmental Impact Report and Statement. Part I: Assessment of Practicability Draft San Clemente Dam Water Quantity

1988 June
Bechtel Civil Inc. New San Clemente Dam Project Evaluation of Slope Stability in the Reservoir Area
San Clemente Dam


1988 June
Bechtel Civil Inc. New San Clemente Dam Project Seismic Design Criteria, Review of Previous Studies and Preliminary Recommendations
San Clemente Dam


1988 July
EIP Associates Estimates of Housing and Employment at Buildout Within the Monterey Peninsula Water Management District Final Monterey Peninsula


1988 August
MPWMD Interim Relief Plan Draft 2



1988 September
MPWMD Interim Relief Plan




1988 September
EIP Associates Riparian Habitat Assessment. Alternatives of the New San Clemente Dam Project
San Clemente Dam Riparian

1988 September
MPWMD Evaluation of Water Supply Alternatives for the New San Clemente Project Supplemental Draft Environmental Impact Report and Statement, Part I: Assessment of Practicability Final San Clemente Dam Water Quantity

1988 September
Archaeological Consulting Preliminary Cultural Resources Reconnaissance of Erosion Control Projects Carmel River Monterey County California
Carmel River Erosion Cultural Resources
1988 October
J. Laurence Mintier & Assoc Water Supply and Water Distribution Options. Draft Allocation Program EIR Phase II - Revised Draft Draft
Water Quantity

1988 October McNiesh, Charles M.
A Methodology for Predicting Riparian Vegetation Impacts Due to Pumping the Carmel Valley Aquifer
Carmel Valley Riparian

1988 October
DMC Energy Inc. Monterey Peninsula Water Corps Preliminary Summary
Monterey Peninsula


1988 November
MPWMD Evaluation of Water Supply Alternatives for the New San Clemente Project Supplemental Draft Environmental Impact Report and Statement. Part II: Assessment of Performance Draft San Clemente Dam Water Quantity

1988 November
DMC Energy Inc. Monterey Peninsula Retrofit Program Final Monterey Peninsula


1988 November Matthews, M. A.
Plant Survey Carmel River Mid Valley Area
Carmel River, Mid Valley Riparian

1989 January McNiesh, Charles M.
An Inventory of the Riparian Vegetation Resource of the Carmel Valley
Carmel Valley Riparian

1989 February
Staal Gardner & Dunne Inc Hydrogeologic Assessment, Ryan Ranch Mutual Water Company, Construction of Well Nos. 9 & 10 Monterey Research Park, Monterey County California
Ryan Ranch


1989 February Matthews, Graham MPWMD Technical Memorandum 88-03, Evaluation of Reservoir Sedimentation Rates in the Upper Carmel River Watershed
Upper Carmel River Sediment Transport

1989 March
J. Laurence Mintier & Assoc Jones & Stokes Assoc D.W. Kelley & Assoc and Water Resource Associates Draft Environmental Impact Report; Water Allocation Program Draft EIR



1989 March Clark, Joseph C.
Geologic Analysis of the Cypress Point Fault in the Vicinity of the Lower Carmel River Valley
Lower Carmel Valley River


1989 March
Bechtel Civil Inc. New San Clemente Dam Downstream Migrant Collection Facilities Pine Creek Fish Screening Structure
San Clemente Dam Wildlife Habitat

1989 March
MPWMD Lead Agency Carmel Sanitary District Marina County Water District Pebble Beach Community Services District Monterey Regional Water Pollution Control Agency Monterey Co. Flood Control & Water Conservation District Water Conservation Plan for Monterey County
Monterey County


1989 March
Denise Duffy & Associates CSD/PBCSD Wastewater Reclamation Project Draft EIR



1989 May
Archaeological Consulting Archaeological Literature Study and Mitigation Recommendations for the Cañada de la Segunda Reservoir Carmel Valley Monterey County California
Cañada de la Segunda Reservoir


1989 May Bell, Andrew MPWMD Technical Memorandum 89-04; Analysis of New Los Padres Reservoir Rim Dam Concept
Los Padres Dam


1989 May Mello, Henry
Public Hearing on the MPWMD




1989 May
Staal Gardner & Dunne Inc Hydrogeologic Investigation Carmel River Aquifer Coastal Portion Monterey County CA
Carmel River Aquifer, Coastal Portion Groundwater

1989 June
Archaeological Consulting Cultural Resources Literature Study and Mitigation Recommendations for Phase II of the New San Clemente Project EIR/EIS Carmel Valley Monterey County CA
San Clemente Dam Cultural Resources

1989 June
Bechtel Civil Inc. Monterey Peninsula Water Supply Project New Los Padres New San Clemente and San Clemente Creek Projects Preliminary Designs and Cost Estimates
Los Padres Dam Water Quantity

1989 June
Bechtel Civil Inc. Monterey Peninsula Water Supply Project New San Clemente Site Downstream Migrant Steelhead Screening Facility Collection Efficiency
San Clemente Dam Water Quantity Steelhead
1989 June
Denise Duffy & Associates CSD/PBCSD Wastewater Reclamation Project Final EIR



1989 July
BioSystems Analysis Inc . Cañada Reservoir Project Preliminary Biological Assessment
Cañada Reservoir Wildlife Habitat

1989 July
Norman Janke Associates Evaluation of Regional and Local Seismicity for the Cañada Reservoir Carmel Valley CA
Cañada Reservoir


1989 July
Rivertech Inc. Mechanics of Carmel River at Williams Ranch, A Reconnaissance Level Study
Williams Ranch


1989 July
Grice Engineering Inc. Preliminary Evaluation of the Incorporated Embankment Site & Reservoir Area for Cañada Reservoir Phase 1A
Cañada Reservoir


1989 August Williams, John Philip Williams & Associates Carmel River Lagoon Enhancement Plan. Report on Potential Mitigation Sites
Carmel River Lagoon


1989 August
Denise Duffy & Associates Preliminary Environmental Assessment of Cañada Reservoir
Canada Reservior


1989 August Stern, Henrietta MPWMD Technical Memorandum 89-06 Development of Water Demand Estimates at Buildout for the Monterey Peninsula Water Supply Project EIR/EIS
Monterey Peninsula Water Quantity

1989 September
MPWMD/Compagno MPWMD/Lease-Anthony S. Compagno & Catherine




1989 October
Water Resource Association Consulting Engineers Preliminary Hydrologic Study for Cañada Reservoir
Cañada Reservoir


1989 October Dettman, D. MPWMD Technical Meomorandum 89-05 Evaluation of Instream Flow




1989 October
Denise Duffy & Associates Cañada Reservoir Project Cost Estimate
Cañada Reservoir


1989 November Dettman, D. MPWMD Technical Memorandum 89-03 The Quantity of Steelhead Spawning Habitat Inundated or Blocked by Alternative Water Supply Projects in the Carmel River Basin
Carmel River Water Quantity Steelhead
1989 November
MPWMD Memorandum: Water Supply Status as of November 1 1989

Water Quantity

1989 November Oliver, Joseph MPWMD Technical Memorandum 89-08 Hydrology of the Carmel River Lagoon
Carmel River Lagoon


1989 November Alley, Donald
Preliminary Draft Instream Flow Requirements Steelhead Spawning and Rearing Carmel River Monterey County, 1989
Carmel River Wildlife Habitat Steelhead
1989 November
Western Ecological Services Cañada Reservoir Project Preliminary Fisheries Assessment
Cañada Reservoir Wildlife Habitat

1989 November
Denise Duffy & Associates Preliminary Environmental Assessment of Cañada Reservoir, Part II
Cañada Reservoir


1989 December
Grand Jury Grand Jury Report 1989




1990 January
Grand Jury Response to Grand Jury Report




1990 January
J. Laurence Mintier & Assoc Jones & Stokes Assoc D.W. Kelley & Assoc and Water Resource Associates Administrative Draft Final Environmental Impact Report, Volume 1 Appendices, Water Allocation Program Administrative Draft Final EIR



1990 January
J. Laurence Mintier & Assoc Jones & Stokes Assoc Administrative Draft Final Environmental Impact Report, Volume 1 Administrative Draft Final EIR



1990 January
D.W. Kelley & Associates and Water Resource Associates Water Allocation Program




1990 January
Parton & Edwards Construction Inc. Drinking Water Supply System for Monterra Ranch Project
Monterra Ranch Water Quantity

1990 January
Bechtel Civil Inc. Cañada Reservoir Project Analysis of Alternative Ownership Options
Cañada Reservoir


1990 March
Rationing Review Committee Final Report of the Rationing Review Committee Final



1990 March Fuerst, D. W. MPWMD Technical Memorandum 90-05, Estimated Pumping Capacities for Production Wells Operated by the California-American Water Company Monterey District




1990 April
J. Lawrence Mintier & Associates Final Environmental Impact Report Volume I Water Allocation Program Final EIR



1990 April
J. Lawrence Mintier & Associates Final Environmental Impact Report Volume II - WaterAllocation Program Final EIR



1990 April
J. Lawrence Mintier & Associates Summary of Water Allocation Program EIR




1990 April Montgomery, James M. James M. Montgomery Consulting Engineers American Water Works Service Co. Playa Well #4 Water

Groundwater

1990 April
MPWMD Water Allocation Program EIR - A Summary of Issues Impacts & Process To Be Followed




1990 May
Engineering Science Inc., MPWMD CAWD/PBCSD Water Reclamation Project Pacific Grove Extension




1990 June Buel, Bruce MPWMD 1990 - 1995 Capital Improvement Plan and Present Worth Primer (March 1990) Draft



1990 June Laclergue, Bruce MPWMD MPWMD Planning Memorandum #90-91 Reservoir Clearing and Grubbing for the New Los Padres Project
Los Padres Dam


1990 July
Staal Gardner & Dunne Inc Hydrogeologic Investigation PCA Well Aquifer Test Sand City CA (draft)
Sand City Groundwater

1990 July
Staal Gardner & Dunne Inc Hydrogeologic Investigation PCA Well Aquifer Test Sand City California
San City Groundwater

1990 July
Staal Gardner & Dunne Inc Installation of Monitoring Well Cluster Monterey Sand Co. Sand City Monterey County CA
Sand City Groundwater

1990 July
Staal Gardner & Dunne Inc Installation of Deep Monitoring Well California American Water Co. Plumas Site City of Seaside Monterey County CA
Seaside


1990 July
The Habitat Restoration Group Instream Flow Analysis of Steelhead Spawning & Rearing

Wildlife Habitat Steelhead
1990 July
Staal Gardner & Dunne Inc Summary of Operations Paralta Test Well Seaside California
Seaside


1990 August
Staal Gardner & Dunne Inc Hydrogeologic Update Seaside Coastal Ground Water Basins Monterey County CA
Seaside Groundwater

1990 August
Woodward-Clyde Consultants Bartle Wells Associates MCFCWCD Water Capital Facilities Plan Volume I (draft 72)




1990 August Oliver, Joseph MPWMD Summary of Carmel Valley Aquifer Ground Water Quality From Coastal Monitor Wells
Carmel Valley Water Quality Groundwater
1990 August Dettman, D. MPWMD Technical Memorandum 90-01 Spawning Habitat Mitigation Plans for Alternative Water Supply Projects in the Carmel River Basin
Carmel River Water Quantity

1990 September Cofer, Jim MPWMD Proposed Five Year Capital Facilities Plan




1990 September
MPWMD Proposed Seawater Desalination Program

Desalination

1990 September
Staal Gardner & Dunne Inc Hydrogeologic Investigation Monterey Coastal Basin Monterey County California
Monterey Coastal Basin


1990 October Williams, John G.
Carmel River Lagoon & Wetland Enhancement Plan Preliminary Draft Carmel River Lagoon


1990 October
MPWMD MPWMD Final Five-Year Mitigation Plan For Option V-- 16700 AF CAL-AM Production




1990 October
Ad Hoc Water Committee Report of Ad Hoc Water Allocation Committee




1990 October
Graham Matthews & Asso. Potential Changes in Water Surface Profiles after Dam Construction in the Carmel River Watershed
Carmel River


1990 November McNiesh, Charles M.
Projected Riparian Vegetation Impacts Under the Various MPWSP EIR/EIS Alternatives Draft
Riparian

1990 November
Board of Directors Attachment E - Findings of the Board of Directors of the MPWMD for Certification of the Final Water Allocation Program and for Adoption of the Water Allocation Program




1990 November
MPWMD Final Five Year Mitigation Program for Option V--16700 AF Cal-Am Production Water Allocation Program




1990 November Dettman, D. MPWMD Technical Memorandum 90-03/The Quantity of Steelhead Rearing Habitat Inundated or Blocked by Alternative Water Supply Projects in the Carmel River Basin
Carmel River Water Quantity Steelhead
1990 December Kondolf, G. Mathias and Matthews, Graham
Assessment of Potential Impacts of Monterey Peninsula Water Supply Project on Downstream Channel Geomorphology of the Carmel River
Monterey Peninsula Water Quantity

1990 December
Staal Gardner & Dunne Inc Summary of Operations Del Rey Oaks No. 1 Test Well
Del Ray Oaks Groundwater

1990 December
Grand Jury Grand Jury Final Report




1990 December Matthews, W.V. Graham, III
Design of River Restoration Projects on Gravel-Bed Rivers Emphasizing Riparian Revegetation -- M.S. Thesis Earth

Riparian

1991 January Adams, E. and Fernandes, L. Wells Fargo Bank Private Banking Liquidity Management Services




1991 January
Bechtel Corporation MPWSP New Los Padres & New San Clemente Projects Fish Collection Facilities Conceptual Designs and Cost Estimates
Los Padres Dam


1991 March McNiesh, Charles M.
Projected Riparian Vegetation Impacts Along The Carmel River Under Eleven Water Supply Project Alternatives
Carmel Valley Water Quantity Riparian
1991 March McNiesh, Charles M.
Irrigating Riparian Vegetation In The Carmel Valley California-A Preliminary Report of Findings Appendix I: Tables, Appendix II: Figures
Carmel Valley Riparian

1991 April
Denise Duffy & Associates (prepared for Cal-AM) Environmental Assessment of the Cañada Reservoir Project
Cañada Reservoir




Freidland, Dave, and Davis, John EIP Associates Administrative Draft Environmental Impact Report/Statement Volume I II & Appendices




1991 April
MPWMD Technical Memorandum 91-01 Documentation of Production




1991 April
Boyle Engineering MPWMD Desalination Feasibility Study Status Report on Site Evaluation

Desalination

1991 April
Staal Gardner & Dunne Inc Hydrogeologic Simulation - Carmel Valley Aquifer System -
Carmel Valley Aquifer Groundwater

1991 May
Philip Williams & Assoc Ltd Carmel River Lagoon Enhancement Plan Draft Carmel River Lagoon


1991 June Mercurio, Ed
San Clemente Project Job No. 89090
San Clemente Dam


1991 June
Woodward-Clyde Consultants Desalination Water Supply Project Permitting Requirements Analysis

Desalination

1991 July Hamilton, Robert, Laughlin, Jack, and Morin, O.J.
MPWMD Desalination Feasibility Study Moss Landing Site
Moss Landing Desalination

1991 July
Boyle Engineering MPWMD Desalination Feasibility Study

Desalination

1991 July
Graham Matthews & Asso., MPWMD Draft Riparian Habitat Mitigation Plan for the Monterey

Riparian

1991 August Fuerst, D. W. MPWMD MPWMD Technical Memorandum 91-03 Overview of the Carmel Valley Simulation Model ADDENDUM
Carmel Valley


1991 August
MPWMD Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project Volume I
Monterey Peninsula Water Quantity

1991 August
MPWMD Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project Volume II
Monterey Peninsula Water Quantity

1991 August
MPWMD Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project Appendices
Monterey Peninsula Water Quantity

1991 August Stern, Henrietta MPWMD Executive Summary of the Supplemental Draft Environmental Impact Report and Statement for the Monterey Peninsula Water Supply Project
Monterey Peninsula Water Quantity

1991 September McNiesh, Charles M.
Irrigating Riparian Vegetation in the Carmel Valley CA. Volumes I: Text; Volume II: Tables & Figures; Volume III:
Carmel Valley Riparian

1991 September Oliver, Joseph MPWMD MPWMD Technical Memorandum 91-03 - Summary of September Ranch Well Aquifer Test
September Ranch Groundwater

1991 October
EIP Associates Biological Resource Evaluation for the Desalination Component of the Monterey Peninsula Water Supply Project
Monterey Peninsula Water Quantity

1991 November Dettman, D. MPWMD Technical Memorandum 91-04/Development of a Substrate




1991 December
Brown & Caldwell San Clemente Reservoir Safe Yield Analysis Phase I, California; American Water Company
San Clemente Dam


1991 December
Grand Jury Monterey County Grand Jury Final Report 1991




1991 December Williams, John Philip Williams & Associates Carmel River Lagoon Enhancement Plan Draft Carmel River Lagoon


1992 January
K2 Environmental Carmel Valley Groundwater Quality Evaluation
Carmel Valley Groundwater

1992 January
MPWMD 1991 Annual Report for the Five Year Mitigation Program




1992 January
Bartle Wells Associates Preliminary Phase I - Revenue and Financing for Water Management Facilities

Management

1992 February
Staal Gardner & Dunne Inc Preliminary Feasibility Study Saline Ground Water Intake System Sand City California
Sand City Groundwater

1992 March
Archaeological Consulting Preliminary Cultural Resources Reconnaissance for the MPWMD Desalination Pipeline Monterey County California
Monterey County Desalination Cultural Resources
1992 March
JMM Consulting Engineers Desalination Preliminary Design Final Report
Desalination

1992 April
EIP Associates Near-Term Desalination Project Draft EIR
Desalination

1992 May
MPWMD Final Phase III Water Rationing MPWMD




1992 June
D. W. Alley & Associates Instream Flow Analysis of Steelhead Spawning Habitat

Wildlife Habitat Steelhead
1992 June
Archaeological Consulting Cultural Resources Reconnaissance of the New Los Padres Dam and Reservoir Project Carmel Valley Monterey County California (Revised July 21 1992)
Los Padres Dam Cultural Resources

1992 June
Archaeological Consulting Appendix 1, Cultural Resource Site Records to Accompany Supplement to Cultural Resources Reconnaissance of the New Los Padres Dam and Reservoir Project Carmel Valley, Monterey County CA
Los Padres Dam Cultural Resources

1992 June
Bartle Wells Associates Phase II Report Financing & Implementation for Water




1992 June
EIP Associates MPWMD New Los Padres Dam Project; Upland Mitigation Plan Preliminary Draft Los Padres Dam


1992 June MPWMD- Ambessaw Assegued MPWMD The Carmel River Riparian Corridor Mgt. Plan - Vegetation Survey Mapping Plan
Carmel River Riparian

1992 June
MPWMD Riparian Habitat Mitigation Plan for the Monterey Peninsula
Monterey Peninsula Riparian

1992 June
Bechtel Corporation MPWSP New Los Padres Dam Geotechnical Studies
Los Padres Dam


1992 June
MPWMD MPWMD Calculated Average Consumptions: Comercial Uses




1992 June
Philip Williams & Assoc Ltd Carmel River Lagoon Enhancement Plan
Carmel River Lagoon


1992 July Montgomery, James M. James M. Montgomery Consulting Engineers Refinement of Preliminary Design for 7 MGD Desalination Facility at Sand City Site
Sand City Desalination

1992 July
CH2MHill Monterey Peninsula Reclaimed Water Urban Reuse Project Feasibility Report
Monterey Peninsula


1992 July
Archaeological Consulting Cultural Resources Reconnaissance of the New Los Padres Dam and Reservoir Project Carmel Valley Monterey County CA updated (see June 1992) Los Padres Dam Cultural Resources

1992 July
EIP Associates MPWMD New Los Padres Dam Project - Valley Oak
Los Padres Dam


1992 August
SWRCB Diversion and Use of Water From the Carmel River in Monterey County - Four Complaints Application 27614 and Petitions for Change and Extension of Time of Permit 7130B. Volume IV. Monday August 31 1992
Carmel River


1992 September
SWRCB Diversion and Use of Water from the Carmel River in Monterey County - Four Complaints Application 27614 and Petitions for Change and Extension of Time of Permit 7130B. Volume IV. Tuesday September 1 1992
Carmel River


1992 September
SWRCB Diversion and Use of Water from the Carmel River in
Carmel River


1992 September
SWRCB Diversion and Use of Water from the Carmel River in
Carmel River


1992 September
Staal Gardner & Dunne Inc Feasibility Study Saline Ground Water Intake/Disposal

Groundwater

1992 November
ABA Consultants Effects of Hyper-saline Water on Survival of Olivella Pycna

Water Quality Wildlife Habitat
1992 December
Voter Dist. Advisory Comm. Final Report and Recommendations of the Voter District Advisory Committe to the MPWMD




1992 December
Finance Advisory Comm. Recommendations of the Finance Advisory Committee to the MPWMD Board of Directors Final Report



1992 December
Paine Webber Incorporated Variable Rate Demand Certificates of Participation (Waste




1992 December
EIP Associates Near-Term Desalination Project Final EIR
Desalination

1992 December Breschini, Gary S. SOPA & Archaeological Consulting Phase II Archaeological Investigations for the New Los Padres Dam & Reservoir Project, Carmel Valley, Monterey CA Draft Los Padres Dam


1993 January
Brown & Wood Variable Rate Demand Certificates of Participation (Wastewater Reclamation Project) Series 1992 Volume I & II–1999 Letter of Credit Substitution




1993 January Brown, C. and Laredo, D. De Lay & Laredo Findings for Certification of the Near-Term Desalination Project Final Environmental Impact Report

Desalination

1993 February
U.S. Army Corps of Engin.Permit App. #16516S09 SCH #87092203 Supplemental Draft EIR/Statement II: Volume I II and Appendices Draft



1993 February
Graham Matthews & Asso. Evaluation of Impacts of the Monterey Peninsula Water Supply
Monterey Peninsula Water Quantity

1993 February
Graham Matthews & Asso. Assessment of Channel-Forming Discharge for the Carmel




1993 February
EIP Associates The Carmel River Riparian Corridor Wildlife Habitat
Carmel River Riparian

1993 February
US Army Corps of Engineers Comments & Responses on the August 1991 Supp. Draft




1993 March
MPWMD MPWMD Water Allocation Program Final Environmental




1993 March Nottenkamper, Margo and Bell, Andrew M. MPWMD MPWMD Near-Term Desalination Project Engineer's Report

Desalination

1993 April
MPWMD MPWMD Ten Year Review Carmel River Management
Carmal River


1993 April
MPWMD MPWSP EIR/EIS 404 (B) (1) Compliance Rev. Draft



1993 April Breschini, Gary S., and Haversat, Trudy SOPA & Archaeological Consulting Phase II Cultural Resources Investigations for the New Los Padres Dam & Reservoir Project Carmel Valley Monterey County CA
Los Padres Dam


1993 April
MPWMD Resolution No. 93-05, A Resolution of the Board of Directors of the MPWMD Expressing Support for the Establishment of Resident Voter Divisions for District Elections




1993 April Lapkoff, S.
Documentation for Request for Preclearance of Change to




1993 May
MPWMD Formation of Resident Voter Divisions (Audio & Video tapes copy of report to Justice Dept.) stored in ASD file room #1 in safe-room.




1993 May
Technical Advis. Comm. Allocation of Water from the Seawater Desalination Project

Desalination

1993 May Litwin, Yoram J.
Tech-Memo Adaption of CVCALB - Main Frame Version to Personal Computers (486DX/25)




1993 June
MPWMD Findings for Certification of the Water Allocation Program




1993 June
MPWMD Resolution No. 93-11 A Resolution of the MPWMD Adopting Findings for Increasing the Cal-Am Production Limit and Certifying the Supporting CEQA Documentation




1993 June
MPWMD Resolution No. 93-12 A Resolution of the MPWMD Certifying and Adopting Findings for the Water Allocation Program Final Environmental Impact Report and Selecting a Water Distribution Formula for Paralta Well




1993 June
Brown & Caldwell Draft, Cañada Reservoir Project Phase 3-Analysis of 15,000 Acre-Foot Reservoir




1993 July
MPWMD MPWMD Interim Environmental Relief Agreement, 1992-93 Annual Report




1993 September Hanna, B., and Dettman, D. MPWMD Steelhead Smolt Mortality Experiment at Los Padres Dam Technical Memorandum 93-01
Los Padres Dam Wildlife Habitat Steelhead
1993 September
WESCO Assessment of Wetland and Riparian Communities Bordering
Fort Ord Riparian

1993 October
MPWMD 404 Permit Application #20364S09 (cross reference to #16516S09) (Application for Department of the Army Permit)




1993 December
US Army Corps of Engineers Public Notice for the New Los Padres Dam Project #20364S09
Los Padres Dam


1993 November
EIP Associates Valley Oak Woodland Mitigation & Monitoring Plan for the New Los Padres Water Supply Project
Los Padres Dam Water Quantity

1993 November
Prunuske Chatham Inc Construction Staging Area Mitigation & Monitoring Plan for the New Los Padres Water Supply Project
Los Padres Dam Water Quantity

1993 November Dettman, David MPWMD Technical Memorandum 93-03 - Recommended Minimum Streamflow Requirements for the Reach Between the Proposed New Los Padres Reservoir and Existing San Clemente Reservoir
Los Padres Dam


1993 December
D.W. Alley & Associates Assessment of the Potential Impacts of the Proposed New Los Padres Dam Project on the Steelhead Sport Fishery of the Carmel River
Los Padres Dam Wildlife Habitat Steelhead
1994 January Fuerst, D. MPWMD Technical Memorandum 94-01 - Comparison of Simulated Daily Flows under Unimpaired No Project and 24000 AF




1994 February Chaffey, Mark
Fish Migration Monitor Installation and Operating Instructions

Wildlife Habitat

1994 February
Fort Ord Reuse Group Summary of Base Reuse Plan Preliminary Draft Fort Ord


1994 March
Assegued & Associates Riparian Habitat Mitigation Plan for the New Los Padres Project Carmel River Monterey County CA
Los Padres Dam Riparian

1994 March
D.W. Alley & Associates IFIM Study (Development of Weighted Usable Area Curves)




1994 March
Fishery Working Group Recommended Instream Flow Requirements for the Carmel




1994 March
Citizen's Financial Committee Connection Charge Computation New Los Padres Dam
Los Padres Dam


1994 March
US Army Corps of Engineers EIR/EIS Volume I New Los Padres Dam Project Final Los Padres Dam


1994 March
US Army Corps of Engineers EIR/EIS Volume II NLPDP Mitigation & Monitoring Program Plan Final



1994 March
US Army Corps of Engineers Final EIR/EIS Volume III NLPDP Technical Appendices Final



1994 March
US Army Corps of Engineers EIR/EIS Volume IV NLPDP Responses to Comments on SD EIR/EIS-II Final



1994 April Lindberg, Thomas MPWMD Technical Memorandum 94-03 Changes in the Calculation of




1994 May
MPWMD 1993 Annual Report - 5-Year Mitigation Program




1994 May Lauster,